2027 Flooring Replacements Project at Stockton Elementary and Middle Schools
Stockton Community Unit School DistrictIllinois
Stockton Community Unit School District #206 is seeking bids for flooring replacements at Stockton Elementary and Middle Schools in Stockton, Illinois. Bids must be submitted by 2:00 pm CST on December 10, 2026, to the District Office at 540 N. Rush Street. A mandatory pre-bid meeting is required on November 24, 2026, at the project site. Prevailing wage rates apply. Bidders must be responsive to all contract documents and meet specified contractor qualifications.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 10, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 10, 2026, 2:00 PM Central Time
- Submission
- mail, hand delivery
Scope of work
- Replace flooring at Stockton Elementary School, 500 N. Rush Street
- Plans and specs available from November 19, 2026
Steps to Bid
- 1
Attend the mandatory pre-bid meeting on November 24, 2026, at the project site. was Nov 24, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Obtain plans and specifications from Cordogan Clark & Associates, Inc. plan room at Official linkPro, available starting November 19, 2026. was Nov 19, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 3
Prepare and submit a sealed bid, conspicuously marked, by 2:00 pm CST on December 10, 2026. by Dec 10, 2026, 2:00 PM
What you'll need
Insurance
RequiredPrevailing wage rates shall apply to this Project.
Submission
Mail, Hand delivery
How to submit
Bids must be sealed, conspicuously marked, and delivered to the District Office at 540 N. Rush Street, Stockton, Illinois 61085, by 2:00 pm CST on December 10, 2026.
In person/mail: 540 N. Rush Street, Stockton, Illinois 61085
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Plans and specifications are available starting November 19, 2026, through Cordogan Clark & Associates, Inc. plan room at [link available with Pro]. Bids must be submitted in sealed envelopes, conspicuously marked, and received no later than 2:00 pm CST on December 10, 2026, at the District Office, 540 N. Rush Street, Stockton, Illinois 61085, where they will be publicly opened and read aloud. All bids must conform to and be responsive to all bidding and contract documents, including contractor qualifications as specified therein.
Key dates
- Pre-bid meeting
- Nov 24, 2026, 10:00 AM Central Time
- Bids due
- Dec 10, 2026, 2:00 PM CT
Similar bids in Illinois
- DHS IFB AMHC AFC Carpet Removal and Epoxy Flooring Install · closes Dec 1, 2026
- Flooring Replacement at Eldorado Elementary School · closes Dec 29, 2026
- Renovation of Flooring Replacement at Warren-Newport Public Library · closes Dec 8, 2026
- Zeigler-Royalton Elementary/Jr. High School Floor Replacement · closes Dec 8, 2026
- Grayslake/Southlake Flooring Replacement Phase 3 · closes Dec 10, 2026
Closing soon in Illinois
- Purchase of a New Plow Dump Box Truck · closes Nov 30, 2026
- Aircraft Rescue and Firefighting (ARFF), Airport Operations, and Security Services · closes Nov 30, 2026
- Lawn Care and Landscaping Services for Dundee Library, East Dundee, IL · closes Dec 3, 2026
- UPCOMING ..... Alton Driver Relief Facility (rebid) · closes Dec 4, 2026
- Addison School District 4 2027 Capital Improvements · closes Dec 4, 2026