Air Park Drive Sanitary Sewer Improvements Project
Boxelder Sanitation DistrictColorado
The Boxelder Sanitation District is soliciting sealed bids for the Air Park Drive Sanitary Sewer Improvements Project. Work includes replacing 1,130 linear feet of existing 8-inch and 10-inch sanitary sewer with new 10-inch PVC pipe, constructing five new 48-inch sanitary sewer manholes, modifying existing manholes, bypass pumping, utility coordination, and surface restoration. Water main modifications include replacing 60 feet of 24-inch PCCP with 24-inch restrained-joint ductile iron pipe and 60 feet of 12-inch ACP with 12-inch C900 PVC pipe, including fittings, transitions, and thrust restraint. Bids must be submitted by 2:00 pm on Friday, December 11, 2026, via [link available with Pro] or in person at the District office. A mandatory pre-bid conference is scheduled for November 30, 2026, at 1:00 pm at the District office. Each bid must include a bid guaranty bond equal to at least 5% of the bid amount. The successful bidder must provide a 100% Performance Bond and 100% Payment Bond.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 11, 2026, 2:00 PM Mountain Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- online portal, in person
- Required submission items
- 4 items · full checklist with Pro
Steps to Bid
- 1
Obtain bidding documents from Official linkPro
- 2
Attend the mandatory pre-bid conference on November 30, 2026, at 1:00 pm at 3201 E Mulberry St, Fort Collins, CO 80524 by Nov 30, 2026, 1:00 PM
- 3
Submit sealed bid by 2:00 pm on Friday, December 11, 2026, via Official linkPro or in person at the District office by Dec 11, 2026, 2:00 PM
What you'll need
Submission
Online portal, In person
NAICS
237130, 237199
How to submit
Bids must be submitted sealed via Official linkPro or delivered in person to the District office at 3201 E Mulberry St, Fort Collins, CO 80524. Bids received after 2:00 pm on December 11, 2026, will not be accepted.
In person/mail: 3201 E Mulberry St, Fort Collins, CO 80524
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Electronic (.pdf format) copies of bidding and contract documents are available at [link available with Pro]. Each bid must be accompanied by a bid guaranty bond or certified/cashier's check payable to the Owner in an amount not less than 5% of the bid amount. The successful bidder will be required to furnish a Performance Bond and a Payment Bond, each in the amount of 100% of the contract price. A mandatory pre-bid conference will be held at the District office, 3201 E Mulberry St, Fort Collins, CO 80524, on Monday, November 30, 2026, at 1:00 pm.
Key dates
- Pre-bid meeting
- Nov 30, 2026, 1:00 PM Mountain Time
- Bids due
- Dec 11, 2026
More from this agency
- Old Clay Interceptor Replacement Project · closes Dec 3, 2026
Similar bids in Colorado
- James M Robb State Park Island Acres Wastewater Improvements · closes Dec 15, 2026
- Request for Proposals: Water and Wastewater Treatment Chemicals · closes Nov 26, 2026
- Snake River WWTP Sewer Line Cleaning & CCTV Inspection
- Sanitary Sewer Muffin Monster Replacement · closes Dec 15, 2026
- 2027-2029 Emergency Sanitary Sewer Point Repair · Pueblo · closes Dec 2, 2026
Closing soon in Colorado
- Picnic Tables and Bear Boxes Installation at Winiger Ridge Dispersed Campsites 1-5 · closes Nov 24, 2026
- Northern California Area Office (NCAO) Shasta Power Plant (SH-PP) Condense Mode Parts · closes Nov 24, 2026
- Pathfinder Park Ag Lease · closes Nov 24, 2026
- GC TRANSFORMER FLUID TESTING · closes Nov 30, 2026
- Installation of Two Stryker Power Load Base Plates at 9th MDG, Beale AFB · closes Nov 30, 2026