Paving Improvements for Madelynn Meadows and Madelynn Crossing, Phase 1 — FM 2933 Municipal Utility District of Collin County
FM 2933 Municipal Utility District of Collin CountyCarrollton, Texas#HOE369A1
FM 2933 Municipal Utility District of Collin County is soliciting sealed bids for paving improvements to serve 182 residential lots in Madelynn Meadows and Madelynn Crossing, Phase 1. The project includes onsite concrete pavement and subgrade, and offsite TxDOT-spec asphalt, base, excavation, and storm sewer work. A mandatory pre-bid conference is required. Bids must include a certified check or bid bond equal to 5% of the total bid amount. The owner may reject any or all bids.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 24, 2026, 10:15 AM CT
- Time stated in bid documents
- Nov 24, 2026, 10:15 AM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- 24,285 SY of 6” 4,000 psi concrete pavement
- 27,529 SY of 6” lime-stabilized subgrade
- 7,953 SY of TxDOT-spec asphalt pavement
- 7,953 LF of 10” flexible base
- 8,941 CY of TxDOT right-of-way excavation
- 853 LF of 2-barrel 3’x2’ RCB through 18” RCP storm sewer
Steps to Bid
- 1
Register for the mandatory pre-bid conference on November 11, 2026, at 10:15 a.m. at JBI Partners, Inc., 2121 Midway Road, Suite 300, Carrollton, Texas 75006. was Nov 11, 2026, 10:15 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Attend the pre-bid conference. Bids from parties not attending will not be accepted. was Nov 11, 2026, 10:15 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Obtain plans, specifications, and bid documents at the pre-bid meeting. was Nov 11, 2026, 10:15 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Prepare and submit a sealed bid with a certified or cashier’s check from a Texas-responsible bank, or a bid bond issued by a surety authorized to do business in Texas, equal to 5% of the total bid amount. was Nov 24, 2026, 10:15 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
Get alerts for bids like this
New paving bids in Texas
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Construction of paving improvements to serve Madelynn Meadows, Phase 1, and Madelynn Crossing, Phase 1, located at the intersection of FM 2933 and CR 336 in Collin County, Texas. Project scope includes onsite paving: approximately 24,285 square yards of 6-inch, 4,000 psi concrete pavement on 27,529 square yards of 6-inch lime-stabilized subgrade. Offsite improvements include approximately 7,953 square yards of TxDOT-spec asphalt pavement on 7,953 linear feet of 10-inch flexible base, 8,941 cubic yards of TxDOT right-of-way excavation, and 853 linear feet of 2-barrel 3’x2’ RCB through 18” RCP storm sewer. All work to be performed in accordance with NCTCOG, Construction Plans, and Collin County specifications. The project serves 182 residential lots on approximately 62 acres. Bids must be accompanied by a certified or cashier’s check from a Texas-responsible bank or a bid bond issued by a surety authorized to do business in Texas, equal to 5% of the total bid amount. The owner reserves the right to reject any or all bids or accept any bid deemed advantageous. All bids received after 10:15 a.m. on November 24, 2026, will be returned unopened.
Similar bids near Carrollton
- Frankford Road Reconstruction Segment 3 · Carrollton · closes Dec 2, 2026
- DNT Mainlane Improvements from IH-635 to PGBT · Plano · closes Dec 18, 2026
- RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033 · Plano · closes Dec 9, 2026
- On-Call Concrete Services · Little Elm · closes Nov 30, 2026
- West Irving Creek Channel Improvements Phase D: South MacAruthr Boulevard to West Oakdale Road · Irving · closes Dec 11, 2026
Closing soon near Carrollton
- RFP Santa's Village Dwellings · Richardson · closes Dec 1, 2026
- Transportation Engineering On-Call Services · Carrollton · closes Dec 4, 2026
- Technology Equipment, Products, Services, and Related Items Extended Open Phase 3 · Frisco · closes Dec 4, 2026
- College Test Preparation Tutoring Services for Students · Southlake · closes Dec 4, 2026
- Construction Manager at Risk for Frisco Animal Facility · Frisco · closes Dec 4, 2026