Construction of Wet Utility Improvements for Madelynn Meadows, Phases 1A and 1B — FM 2933 Municipal Utility District of Collin County
FM 2933 Municipal Utility District of Collin CountyCarrollton, Texas#HOE369A
The FM 2933 Municipal Utility District of Collin County is soliciting sealed bids for the construction of wet utility improvements to serve 182 lots in Madelynn Meadows, Phases 1A and 1B. The project includes 12,008 LF of water lines (12”, 8”, 2.5”), 8,857 LF of sanitary sewer (24”, 12”, 10”, 8”), and 6,039 LF of storm sewer (7’x4’ RCB through 18” RCP). Work is located at FM 2933 and CR 336 in Collin County, Texas. A mandatory pre-bid conference is required on November 11, 2026, at 10:00 a.m. at JBI Partners, Inc., Carrollton, Texas. Bids must be submitted by 10:00 a.m. on November 24, 2026, at the same address. Each bid must include a certified or cashier’s check or bid bond equal to 5% of the total bid amount, payable to the owner. The owner may reject any or all bids.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 24, 2026, 10:00 AM CT
- Time stated in bid documents
- Nov 24, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Required submission items
- 1 items · full checklist with Pro
Steps to Bid
- 1
Register for the mandatory pre-bid conference on November 11, 2026, at 10:00 a.m. at JBI Partners, Inc., 2121 Midway Road, Suite 300, Carrollton, Texas 75006. was Nov 11, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Attend the pre-bid conference. Bidders not attending will not have their bids accepted. was Nov 11, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Access plans, specifications, and bid documents at the pre-bid meeting. was Nov 11, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Prepare and submit a sealed bid by 10:00 a.m. on November 24, 2026, at the office of JBI Partners, Inc., 2121 Midway Road, Suite 300, Carrollton, Texas 75006. was Nov 24, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 5
Ensure the bid is accompanied by a certified or cashier’s check from a Texas bank or a bid bond issued by a surety authorized to do business in Texas, equal to 5% of the total bid amount. was Nov 24, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
Get alerts for bids like this
New construction bids in Texas
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Scope includes approximately 12,008 linear feet of onsite 12”, 8”, and 2.5” water lines; 8,857 linear feet of 24”, 12”, 10”, and 8” sanitary sewer lines; and 6,039 linear feet of 7’x4’ RCB through 18” RCP storm sewer lines. Work shall be performed in accordance with NCTCOG, Construction Plans, North Collin SUD, City of Princeton, and Collin County specifications. Bids must be submitted by 10:00 a.m. on November 24, 2026, at the office of JBI Partners, Inc., 2121 Midway Road, Suite 300, Carrollton, Texas 75006. Bidders not attending the pre-bid conference will not have their bids accepted. Each bid must be accompanied by a certified or cashier’s check from a responsible Texas bank or a bid bond issued by a surety authorized to do business in Texas, equal to 5% of the total bid amount. The owner reserves the right to reject any or all bids or accept any bid deemed advantageous. All bids received after the closing time will be returned unopened.
Similar bids near Carrollton
- CM At-Risk Services for K-5 School Construction — BASIS Texas Charter Schools, Inc · Frisco · closes Dec 17, 2026
- 2026 Manhole Rehabilitation · Plano · closes Dec 7, 2026
- Lynchburg Creek Flood Mitigation Project CIP.1037 · Corinth · closes Dec 10, 2026
- Denton Drive Trail Connector (#27-02) · Farmers Branch · closes Dec 8, 2026
- Routine Facilities Maintenance Services - Fiscal Year 2027 · University Park · closes Sep 30, 2027
Closing soon near Carrollton
- Lease of Two 40-Foot Boat Slips in Lewisville, TX · Lewisville · closes Nov 30, 2026
- Learn How to Do Business with City Government: 2026 Multi-City Virtual Seminar · Plano · closes Dec 2, 2026
- Frankford Road Reconstruction Segment 3 · Carrollton · closes Dec 2, 2026
- Transportation Engineering On-Call Services · Carrollton · closes Dec 4, 2026
- Custodial Services for Landfill Offices · Irving · closes Dec 4, 2026