OpenConstruction

Construction of Concrete Slab and Foundation System for Greenhouse and Headhouse at Lewis County High School

Sealed Bids Lewis County School SystemTennessee

The Lewis County School System is soliciting sealed lump-sum bids for the construction of a concrete slab and foundation system for a greenhouse and headhouse at Lewis County High School in Hohenwald, Tennessee. Work includes excavation, reinforced concrete slab, frost-protected perimeter foundation, column footings, trench drains with 4-inch discharge pipes, and utility sleeves for electric, gas, and water.

On PublicBidSearch: the newspaper notice for this bid.

Open Newspaper Notice Pro

Scope of work

  • Excavate and grade site for foundation
  • Install turned-down perimeter foundation to frost depth
  • Complete related work per project plans and specifications

Steps to Bid

  1. 1

    Register for the mandatory pre-bid conference on Monday, November 23, 2026, at 10:00 a.m. at 818 W. Main St., Hohenwald, TN 38462. was Nov 23, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Submit a sealed, lump-sum bid by the due date and time as stated in the official notice.

What you'll need

NAICS

236115, 236118

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Scope includes minor grading, excavation, reinforced concrete slab, engineered turned-down perimeter foundation extending to required frost-protected depth, column footings, two trench drains with separate 4-inch discharge pipes extending 4 feet outside the foundation, three 4-inch utility sleeves for electric, gas, and water, and related work in accordance with project plans and specifications.

Key dates

Pre-bid meeting
Nov 23, 2026, 10:00 AM Central Time