Crest Ditch Headgate Rehabilitation Project

Sweet Grass Conservation DistrictBig Timber, Montana

The Sweet Grass Conservation District is soliciting sealed bids for the construction of a new concrete headgate with wingwalls and associated structures on the east bank of the Boulder River, approximately 10 miles upstream of Big Timber, Montana. Scope includes demolition of the existing headgate, installation of a 48” slide gate and grated walkway, placement of 245 CY of MDT Class II riprap revetment, and site restoration. Bids must be submitted by 5:00 p.m. local time on December 7, 2026, and must include a bid bond of at least 10% of the bid amount. Successful bidders must provide a 100% performance bond and a 100% labor and materials payment bond. Contractors and subcontractors must be registered with the Montana Department of Labor and Industry. The pre-bid conference is non-mandatory and scheduled for December 1, 2026.

On PublicBidSearch: the newspaper notice, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 8, 2026
Time stated in bid documents
Dec 7, 2026, 5:00 PM Mountain Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Replace existing concrete headgate with new cast-in-place concrete headgate and wingwalls
  • Install 48” slide gate and grated walkway (owner-provided)
  • Demolish and dispose of existing concrete headgate
  • Maintain access roads and install stormwater BMPs
  • Dewatering and surface water management during construction

Steps to Bid

  1. 1

    Obtain the complete bid package from Nicholas McDowell, Project Manager, Pioneer Technical Services, via phone (406-206-6849) or email ([email available with Pro]).

  2. 2

    Review the drawings and project manual at Official linkPro.

  3. 3

    Attend the non-mandatory pre-bid conference on December 1, 2026, at 10:00 a.m. local time. Contact Nicholas McDowell for location details. by Dec 1, 2026, 10:00 AM

  4. 4

    Register with the Montana Department of Labor and Industry (DLI) if not already registered.

  5. 5

    Prepare and submit a sealed bid, including a bid bond of at least 10% of the total bid amount, payable to the Sweet Grass Conservation District. by Dec 7, 2026, 5:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction of the Crest Ditch Headgate Rehabilitation Project on the east bank of the Boulder River, approximately 10 miles upstream of Big Timber, Montana, in Section 28, Township 01 South, Range 14 East. Work includes mobilizing and demobilizing personnel, equipment, supplies, and incidentals; maintaining access roads; dewatering and surface water management; installing and maintaining stormwater BMPs; demolishing and disposing of the existing concrete headgate; salvaging existing suitable riprap rock near the headgate; constructing a new cast-in-place concrete headgate with wingwalls; installing an owner-provided 48” slide gate; installing an owner-provided grated walkway; placing 245 cubic yards (CY) of salvaged and imported MDT Class II Riprap Revetment; placing and compacting general fill; and other miscellaneous work. All laborers and mechanics must be paid at prevailing rates under Montana and Sweet Grass County law. The Sweet Grass Conservation District reserves the right to reject any or all proposals, waive informalities, or postpone award for up to 60 days.

Key dates

Pre-bid meeting
Dec 1, 2026, 10:00 AM Mountain Time
Bids due
Dec 8, 2026

Documents

2 agency-portal links

See all documents · Download with Pro