OpenIFBCloses Dec 1, 2026, 11:59 PM CT

Invitation to Bid: Lyons and McCook Levee Improvements Project

Metropolitan Water Reclamation DistrictIllinois

The Metropolitan Water Reclamation District of Greater Chicago is soliciting sealed proposals via electronic upload to the Bonfire Portal for four separate contracts. Contract 13-199-3F, the Lyons and McCook Levee Improvements Project, has an estimated cost between $2.7 million and $3.3 million, with a bid deposit of $164,016.80. Bid opening is scheduled for December 1, 2026. The other contracts include sluice gate valve actuator repair and parts delivery, sodium bisulfite supply, and boat maintenance. All contracts require compliance with the District's Affirmative Action Ordinance, Revised Appendix D, Appendix V, and the Multi-Project Labor Agreement. A pre-bid walk-through is scheduled for November 16, 2026, at 11:00 A.M. (Chicago time) at the Ottawa Trail Woods North Parking Area in Lyons, IL. A technical pre-bid conference will be held on November 17, 2026, at 2:30 P.M. via Zoom. Bidders must submit electronically through the Bonfire Portal.

On PublicBidSearch: the newspaper notice for this bid.

Open Newspaper Notice Pro

Overview

Due
Dec 1, 2026, 11:59 PM CT
Bid bond
5%
Submission
electronic portal
Required submission items
2 items · full checklist with Pro

Scope of work

  • Repair and improve levee infrastructure at Lyons and McCook locations
  • Furnish and deliver sodium bisulfite for water treatment
  • Repair and maintain debris, pontoon, and skimmer boats

Steps to Bid

  1. 1

    Register and obtain access to the Bonfire Portal

  2. 2

    Submit a sealed proposal via electronic upload to the Bonfire Portal only was Nov 17, 2026, 11:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Attend the voluntary pre-bid walk-through (November 16, 2026, 11:00 A.M. Chicago time) at Ottawa Trail Woods North Parking Area, 7401 Joliet Road, Lyons, IL was Nov 16, 2026, 11:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Attend the voluntary technical pre-bid conference (November 17, 2026, 2:30 P.M. Chicago time) via Zoom was Nov 17, 2026, 2:30 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Insurance

Required

Compliance with the District's Affirmative Action Ordinance Revised Appendix D, Appendix V, and the Multi-Project Labor Agreement are required on this Contract.

Submission

Electronic portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Estimated cost: between $2,709,842.70 and $3,280,335.90. Estimated cost Group A: $359,500.00; Group B: $868,200.00. Total: $1,227,700.00. Bid deposit: none. Estimated cost: $1,560,000.00. Bid deposit: $78,000.00. Contract 27-670-51: Repair and maintenance of debris, pontoon, and skimmer boats. Estimated cost Group A: $134,000.00; Group B: $57,000.00. Total: $191,000.00. Bid deposit: none.

Key dates

Pre-bid meeting
Nov 17, 2026, 2:30 PM Central Time
Site visit
Nov 16, 2026, 11:00 AM Central Time
Bids due
Dec 1, 2026, 11:59 PM CT

More from this agency

Similar open bids

Closing this week nearby