Construction of Wolf River Greenway – Phase Twelve B: Covington Pike to Summer Avenue
Wolf River ConservancyTennessee
The Wolf River Conservancy is soliciting sealed bids for the construction of 5,550 linear feet of paved asphalt trail, one prefabricated pedestrian bridge, drainage improvements, fencing, levee reconstruction, and recreational amenities along the Wolf River Greenway – Phase Twelve B, from Covington Pike to Summer Avenue in Memphis, TN. Work must be performed with minimal environmental impact in a bottomland hardwood forest. The trail must comply with ADA standards; any non-compliant sections must be reconstructed at no additional cost. Bidders must be licensed under Tennessee law and display license details on the bid envelope.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 2, 2026, 3:00 PM CT
- Time stated in bid documents
- Dec 2, 2026, 3:00 PM Central Time
- Submission
- mail, hand delivery
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Construct 5,550 LF of 12-foot-wide paved asphalt trail
- Complete miscellaneous drainage improvements
- Provide recreational site amenities
- Ensure compliance with ADA standards
Steps to Bid
- 1
Register with the Wolf River Conservancy and obtain electronic plans and specifications from Findley Frazer at [email available with Pro].
- 2
Ensure contractor is licensed under Tennessee Code Annotated, Title 62, Chapter 6, and complies with Tenn. Code Ann. 62-6-119.
- 3
Prepare bid package including bid form, bid bond, and required documentation.
- 4
Complete and sign bid envelope with bidder’s name, license number, license expiration date, and license classification (BC, BC-B, HRA, or MU) on the outside.
- 5
Submit sealed bid to the Wolf River Conservancy at 2693 Union Avenue Extd., Suite 205, Memphis, TN 38112, by 3:00 PM (CDT) on Wednesday, December 2, 2026. by Dec 2, 2026, 3:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Sealed bids will be received until 3:00 PM (CDT) on Wednesday, December 2, 2026, for the construction of the Wolf River Greenway – Phase Twelve B: Covington Pike to Summer Avenue. Work will be performed within a bottomland hardwood forest environment; contractor activities must be strictly limited to minimize environmental impact. The trail must be constructed and inspected to comply with applicable ADA regulations. If any areas are identified by the City's ADA Consultant as non-compliant with ADA Standards, the contractor shall reconstruct those areas at no additional cost to the Wolf River Conservancy. Electronic plans and specifications are available from Findley Frazer at [email available with Pro]. Bidders must be licensed contractors under Tennessee Code Annotated, Title 62, Chapter 6, and must comply with Tenn. Code Ann. 62-6-119. The bidder’s license number, license expiration date, and applicable license classification (BC, BC-B, HRA, or MU) must be displayed on the outside of the bid envelope. The name, license number, license expiration date, and license classification must also be included on the envelope.
Key dates
- Bids due
- Dec 2, 2026, 3:00 PM CT
Similar bids in Tennessee
- Upgrade Critical Environments I · closes Dec 21, 2026
- Industrial Controls Training Station (TCAT Memphis) · closes Dec 9, 2026
- Cascade Tank Recoating and Repair Project · closes Dec 1, 2026
- Council Hall Remodel · closes Dec 9, 2026
- Deputy Inspectors - Issuing Agents · closes Jun 30, 2027
Closing soon in Tennessee
- 46KV Sub Transmission Line Trimming and Right of Way Clearing — Invitation to Bid 16201 · closes Nov 30, 2026
- Miscellaneous safety improvements and resurfacing on S.R. 89 from near Mill Street to near Oak Grove Road, Weakley… · closes Dec 4, 2026
- Microsurfacing on S.R. 58 from S.R. 68 to north of Ten Mile Road - Meigs County · closes Dec 4, 2026
- Drain Cleaning on Various State Routes in Davidson, Sumner, and Williamson Counties · closes Dec 4, 2026
- Resurfacing on S.R. 303 from U.S. 27 (S.R. 29) to S.R. 30 - Rhea County · closes Dec 4, 2026