ClosedConstruction

Invitation to Bid: Pierre School District Georgia Morse Middle School Chiller Replacement

Pierre School DistrictSouth Dakota

The project includes removal and disposal of the existing chiller, modification of the concrete pad, regrading of the site, minor fencing changes, installation of a new air-cooled chiller, piping connections, glycol fill and flush, insulation of new and modified piping and pumps, hydronic system testing and commissioning, removal and relocation of the existing cooling water pump, installation of an N+1 pump for redundancy, new 4-inch concrete pad for both pumps, two new VFDs for the CW pumps, integration and programming of the VFDs for lead/lag operation, and all related piping work. A pre-bid meeting is mandatory and will be held on November 9, 2026, at 1:00 p.m. at the school. Bids must be submitted by November 24, 2026, at 1:00 p.m. to the District Office at 211 S Poplar Avenue, Pierre, SD 57501. FAX and email submissions are not accepted.

On PublicBidSearch: the newspaper notice for this bid.

Open Newspaper Notice Pro

Overview

Due
Nov 24, 2026, 1:00 PM CT
Time stated in bid documents
Nov 24, 2026, 1:00 PM Central Time
Bid bond
5%
Submission
mail, hand delivery
Required submission items
4 items · full checklist with Pro

Scope of work

  • Remove and dispose of existing chiller
  • Modify concrete pad and regrade site
  • Connect and insulate all new piping
  • Provide and install two VFDs for CW pumps

Steps to Bid

  1. 1

    Review the full solicitation and project documents available at Official linkPro and Official linkPro.

  2. 2

    Prepare and complete the bid proposal on the forms provided, using permanent ink.

  3. 3

    Sign the proposal in ink by an authorized individual, partner, or corporate officer.

  4. 4

    If mailing, seal the bid envelope inside a regular mailing envelope.

What you'll need

Submission

Mail, Hand delivery

Get alerts for bids like this

New HVAC bids in South Dakota

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

A pre-bid meeting is required and will be held on Monday, November 9, 2026, at 1:00 p.m. The scope includes removal and disposal of the existing chiller; modification of the existing concrete pad by forming, pouring, and finishing extensions to support the new chiller; regrading the surrounding area for proper access and drainage; minor fencing modifications; furnishing and installing a new air-cooled chiller; connecting all piping between the chiller and the building; providing required glycol fill and flush per specifications; insulating all new and modified piping and pumps per specifications; performing hydronic system testing, balancing, and commissioning with written test results; removal of the existing cooling water (CW) pump; relocation of the pump to a new location and installation of an N+1 CW pump for system redundancy; installation of a new 4-inch concrete maintenance pad for both pumps, coordinated with structural requirements; provision and installation of two new Variable Frequency Drives (VFDs) for the CW pumps; integration, programming, and commissioning of the VFDs for lead/lag operation; and connecting, supporting, and insulating all required piping related to pump installation and other work indicated in the drawings and specifications. Bidders must submit proposals on the forms provided, filled in clearly and correctly with ink or another permanent format, and signed in ink by the individual, members of the partnership, or one or more officers of the corporation. The Owner reserves the right to hold and consider bids for up to 30 days after the bid opening. A bidder’s bond must include a certified copy of the power of attorney. The Owner may waive any informality and reject any or all bids. The notice was published on October 29, 2026, and is viewable at [link available with Pro] and [link available with Pro].

Similar bids in South Dakota

Closing soon in South Dakota