Frontier Phase 5A - Water, Sewer, and Drainage Improvements
Wright Farm Municipal Management District of Johnson CountyTexas
The Wright Farm Municipal Management District of Johnson County is soliciting sealed bids for the construction of water, sewer, and drainage improvements for the 191-lot Frontier Phase 5A development. Work includes 160 LF of 4” PVC water line, 8,030 LF of 8” PVC water line, 6,640 LF of 8” PVC sewer line, 6,020 LF of 12” sewer line, 465 LF of 15” PVC sewer line, and various drainage structures including RCP and SBC systems. Bids must be submitted by 2:00 p.m. local time on December 2, 2026, to the District Engineer’s office in Plano, TX, or electronically via CivCast. Bidders must provide evidence of financial and technical qualifications. Inquiries to AJ Roscoe at [email available with Pro] or (214) 420-8494.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 2, 2026, 2:00 PM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery, electronic portal
- Required submission items
- 2 items · full checklist with Pro
Steps to Bid
- 1
Register and obtain bid documents via Official linkPro
- 2
Submit questions to AJ Roscoe by email or phone before the deadline (not stated in document)
- 3
Prepare and submit sealed bid to Pape-Dawson, 6105 Tennyson Parkway, Suite 210, Plano, TX 75024, or electronically via Official linkPro by Dec 2, 2026, 2:00 PM
What you'll need
Submission
Mail, Hand delivery, Electronic portal
NAICS
237130
How to submit
Sealed bids must be addressed to the Board of Directors of Wright Farm Municipal Management District of Johnson County. Bids may be submitted electronically via Official linkPro.
In person/mail: Pape-Dawson, 6105 Tennyson Parkway, Suite 210, Plano, TX 75024
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Water Improvements: Approximately 160 linear feet (LF) of 4-inch PVC water line, 8,030 LF of 8-inch PVC water line, 8-inch gate valves, fire hydrants, and water services. Sewer Improvements: Approximately 6,640 LF of 8-inch PVC sewer line, 6,020 LF of 12-inch sewer line, 465 LF of 15-inch PVC sewer line, 4-inch sanitary sewer services to 191 existing lots and 92 future lots, 4'-6' manholes, and trench water stops. Drainage Improvements: 18-60-inch reinforced concrete pipe (RCP), 5'x4' and 6'x4' and 7'x4' stormwater drainage systems (SBC), curb inlets, headwalls, safety end treatments, junction boxes, stone riprap, grade-to-drain channels, and other related items. All work is based on the 'Plans for the Construction of Utilities Improvements to Serve Frontier Phase 5A' prepared by Pape-Dawson. Bids must be submitted by 2:00 p.m. local time on Wednesday, December 2, 2026, to the Board of Directors of Wright Farm Municipal Management District of Johnson County, at the office of the District Engineer, Pape-Dawson, 6105 Tennyson Parkway, Suite 210, Plano, TX 75024, or electronically via [link available with Pro]. Bids received after the deadline will be returned unopened. Bidders must submit written evidence of qualifications, including financial data, prior experience, and current commitments. The District reserves the right to accept or reject any or all bids. Funding is expected to come from owner revenues and District bonds.
Key dates
- Bids due
- Dec 2, 2026, 2:00 PM CT
More from this agency
- Frontier Phase 5A - Paving Improvements · closes Dec 2, 2026
Similar bids in Texas
- Mass Grading, Detention, Storm Sewer & Appurtenances to Serve Telge Tract Phase 1 Detention and Improve Channel M-127-00 · closes Dec 8, 2026
- On-Call Plumbing Services · closes Dec 4, 2026
- Indoor Water Dispensers & Hydration Solutions · closes Dec 11, 2026
- Plumbing Maintenance and Repair Services for the Fort Worth District · closes Dec 28, 2026
- Terminals A, B & E Grease Interceptor Rehab – Phase 2 · closes Jan 6, 2027
Closing soon in Texas
- Flood Retardance Project Engineering Services · closes Nov 30, 2026
- Construct TWLTL on FM 2821 in Walker County, Texas · closes Dec 2, 2026
- RFP for Microgrid · closes Dec 2, 2026
- Metal Beam Guard Fence Repair, Lubbock County, Interstate Highway 0027 · closes Dec 3, 2026
- Replacement of Front-Room and Backroom 9-1-1 Equipment · closes Dec 3, 2026