Request for Proposals — Alvin Independent School District
Alvin Independent School DistrictTexas
Proposals must be submitted on a lump sum basis with unit and alternate pricing. A pre-proposal meeting is scheduled for November 23, 2026, at 1:00 PM at Shadow Creek High School. The total construction budget is approximately $1.1 million. The District reserves the right to reject any or all proposals. Plans and specifications are available electronically starting November 2, 2026. Compliance with Texas Public Information Act Subchapter J is required.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 3, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 3, 2026, 2:00 PM Central Time
- Submission
- mail, hand delivery
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Renovate entry vestibules at multiple existing campuses
- Renovate administrative suites at multiple existing campuses
- Upgrade associated electrical, mechanical, and plumbing systems
- Attend pre-proposal meeting (highly recommended)
Steps to Bid
- 1
Register or pre-qualify if required (not stated)
- 2
Attend the Pre-Proposal meeting on November 23, 2026, at 1:00 PM at Shadow Creek High School (highly recommended) was Nov 23, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Obtain plans and specifications electronically starting November 2, 2026, from JMB2 Architecture was Nov 2, 2026
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Insurance
RequiredThe contractor or vendor agrees the contract can be terminated if the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter, including the preservation of all “contracting information” (as defined in 552.003) and the provision, upon request of the governmental entity with whom you are contracting, of all contracting information. Contracting information includes, but is not limited to, records, communications and other documents related to the bid process, contract, payments, receipts, scope of work/services, and performance.
Submission
Mail, Hand delivery
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The total construction budget is approximately $1,100,000. A Pre-Proposal meeting/tour will be held on November 23, 2026, at 1:00 PM at Shadow Creek High School, 11850 Broadway, Pearland, TX 77584. Attendance is highly recommended. By submitting, the proposer waives any claim against the Owner, Architect, and their employees related to proposal administration, evaluation, or award. Plans and specifications will be available electronically (PDF) starting November 2, 2026, through the Architect, JMB2 Architecture, at no cost. Hard copies will not be provided. Compliance with Texas Government Code 552.372 is required; failure to comply may result in contract termination. The project is valued at over $1 million, triggering applicability of Subchapter J.
Key dates
- Pre-bid meeting
- Nov 23, 2026, 1:00 PM Central Time
- Bids due
- Dec 3, 2026, 2:00 PM CT
Similar bids in Texas
- Health Professionals Education Building, Level 11A Classroom Upgrades · closes Dec 9, 2026
- Computing Services Annex Combine Rooms 302 and 303 · closes Dec 16, 2026
- Preventive Maintenance on Various Highways in El Paso County, Texas · closes Dec 1, 2026
- Construct One 40' x 60' x 18' Tube Steel Building at Dixie Fire Station 71 and One 60' x 60' x 18' Tube Steel Building… · closes Dec 10, 2026
- Permanent 40-Bed Infirmary Building for Secure Correctional Facility in Huntsville, TX · closes Dec 11, 2026
Closing soon in Texas
- Replace 60-Foot Section of Kitchen Waste Line and Reroute Scullery Drains to Grease Trap · closes Dec 1, 2026
- Drywall Removal, Treatment, and Repair HHSC RAS Office · closes Dec 2, 2026
- Volleyball Court Installation for San Antonio Supported Living Center · closes Dec 3, 2026
- Quarterly Milk for FCI Seagoville · closes Dec 3, 2026
- Professional Development/Contracted Services (Instructional Related) – Consultants, Presenters, Trainers, and Other… · closes Dec 4, 2026