Irrigation Pump System Assessment, Design, Supply, and Installation
Maricopa County Community College DistrictArizona#3637-6
Maricopa County Community College District and Phoenix College are soliciting bids for the assessment, design, supply, and installation of an irrigation pump system that can use flood irrigation water to reduce reliance on potable water in the campus's existing irrigation system. The bid submission deadline is January 8, 2027, at 3:00 PM local time in Arizona. Bidders must submit responses via the BonfireHub portal at the provided URL. The solicitation is an open ITB (Invitation to Bid).
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 8, 2027
- Time stated in bid documents
- Jan 8, 2027, 3:00 PM Arizona Time
- Submission
- electronic portal
Scope of work
- Assess existing irrigation infrastructure and flood water availability
- Supply and install a complete irrigation pump system
- Integrate system with existing campus irrigation network
Steps to Bid
- 1
Register on the BonfireHub portal at Official linkPro
- 2
Review the RFP document titled '3637-6 Irrigations Pump System Assessment, Design, Supply, and Installation RFP.pdf'
- 3
Submit a bid response via the BonfireHub portal by the due date and time by Jan 8, 2027, 3:00 PM
- 4
Ensure all required documents are included in the submission package by Jan 8, 2027, 3:00 PM
What you'll need
Submission
Electronic portal
How to submit
Submit via the BonfireHub portal at Official linkPro. Responses must be submitted electronically through the portal by the deadline.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Maricopa County Community College District (MCCCD or District) and Phoenix College (PC) intends to engage the services of a contractor to assess, design, furnish, and install an irrigation pump system capable of utilizing available flood irrigation water to supplement or replace potable water currently used within the College's existing irrigation infrastructure.
Key dates
- Questions due
- Dec 5, 2026
- Bids due
- Jan 8, 2027
More from this agency
- Estrella Mountain Community College New STEM Building - Design Professional Services (A&E) · closes Dec 8, 2026
- Business Process Mapping · closes Dec 8, 2026
- Districtwide Custodial Services · closes Dec 17, 2026
Similar bids in Arizona
- Douglas Golf Course Front 9 Irrigation Renovations · Douglas · closes Dec 1, 2026
Closing soon in Arizona
- Request for Proposals: Problem Gambling Mobile App for Arizona Department of Gaming, Division of Problem Gambling · closes Nov 30, 2026
- MRO Peer and Panel Review Services - ICA · closes Nov 30, 2026
- Luke Days 2028 Lodging - Intent to Sole Source · closes Dec 2, 2026
- ASRS Long-Term Disability Program Administration · closes Dec 3, 2026
- Request for Qualifications — Track and Field and Tennis Facilities, Arizona State University · closes Dec 4, 2026