ClosedIFBClosed Nov 20, 2026

ITB TRD01 HVAC 260832 B4682 Work Bay Exhaust System Maintenance

Military Division — MILDV - Military DivisionCfmo - Camp Edwards, Massachusetts#BD-27-1069-MILDV-10000-135559

The Military Division is seeking a contractor to perform maintenance on eight exhaust fan units in building 4682 at Camp Edwards, MA. Services include replacing fan belts, cleaning components, greasing fittings, lubricating bearings, and inspecting for damage or corrosion. The estimated contract value is $35,000.00. Prevailing wages are required. A site visit is mandatory for all participating contractors, scheduled for November 9, 2026, at 10:00 am. Bidders must submit security information 48 hours prior to the site visit and attendees must be REAL ID compliant. Electronic quotes must be submitted via COMMBUYS by November 18, 2026, at 10:00 am. Questions are due by November 13, 2026, at 10:00 am.

On PublicBidSearch: the original bid posting, 11 bid documents and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Nov 20, 2026
Bid bond
5%
Performance bond
Required
Payment bond
Required
Submission
electronic portal
Documents analyzed
11

Scope of work

  • Replace fan belts, clean fan blades and shroud.
  • Grease fittings, lubricate bearings, and inspect components.
  • Report all damages found to the Project Manager.
  • Furnish all necessary equipment, labor, parts, materials, and supervision.

Steps to Bid

  1. 1

    Attend mandatory site visit. was Nov 9, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    Contractors are requested to arrive at the Bourne Connery Gate no later than 9:15am. Vendors must submit security information at least 48 hours prior to the site visit to guarantee attendance. Attendees must be REAL ID compliant.

  2. 2

    Submit questions. was Nov 13, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    Questions can be submitted via email to Michaela Kochka at [email available with Pro].

  3. 3

    Submit bid electronically via COMMBUYS.

    Responses must be sent via the “Create Quote” functionality in COMMBUYS. A 5% bid bond must accompany a completed general bid form and be uploaded with the bid if over $50k.

What you'll need

Bid security

Required

A Payment bond in the amount of 50% of the project cost will be required from the awarded contractor for projects exceeding $25K. Performance Bonds in the amount of 100% of the project cost will be required for bids over $150K.

Submission

Electronic portal

Get alerts for bids like this

New HVAC bids in Massachusetts

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Fulfill all maintenance items for the eight exhaust units in the work bays in building 4682 including: replace fan belts, clean fan blades & shroud, grease all fittings, lubricate bearing (if applicable), and inspect all components of the exhaust fans for correct voltage, damage or corrosion. The work includes furnishing all necessary equipment, labor, parts, materials, supervision and other support maintenance services to the eight exhaust fan units in the work bays at 4682 MTA Camp Edwards, MA. Normal working hours for Camp Edwards are 7:00 a.m. to 3:00 p.m. Monday through Friday, excluding Federal & noted State Holidays. Any work requested outside these scheduled times, if approved by the Contracting Officer, will be performed at no additional cost to the government. The contractor shall provide all equipment, labor, materials, parts, supervision and or other support services necessary to perform all the work to fulfill all maintenance items for the eight exhaust units in the work bays in building 4682. All work shall be performed in strict compliance with the parameters of the Statement of Work unless permitted otherwise by the PM. The contractor is cautioned that their supervisor, equipment operators, and laborers shall be thoroughly familiar with the requirements as stated in these documents and this specification and will be required to have a copy of the contract documents with them at the time of service. The contractor service requirements include but are not limited to or by the minimal work elements noted herein and they shall complete the following in their efforts to meet compliance: Perform the following maintenance items: replace fan belts, clean fan blades & shroud, grease all fittings, lubricate bearing (if applicable), and inspect all components of the exhaust fans for correct voltage, damage or corrosion. All inspection/maintenance/certifications as identified in the equipment’s manufacturers O&M manuals and service bulletins, and standard practices for the trade, and/or required by MA Codes which are not specified or described herein shall be deemed part of this specification. Fan information: Manufacturer: Monoxivent – Source Capture Systems, Model: 180 CPS S / 180 CPS CL2. Motor Information: Horsepower: 10 HP, Voltage: 460V, Phase: 3-phase, Frequency: 60 Hz, Belt: AX-42.

Documents

  • Commonwealth_Terms_and_Conditions_16.pdf2 pages
  • form_prompt-pay-discount_2.pdf1 pages
  • ComplianceStateTaxLaws_67.pdf1 pages
  • Real_ID_Requirements_final_3.pdf4 pages
  • Non-Collusion_Form_7.pdf1 pages
  • form_contractor-authorized-signatory-listing-for-contractors.pdf1 pages
  • Bidders_Instructions_260832.pdf6 pages
  • 260832_4682_-_Statement_of_Work_-_Maintenace_Bay_Exhaust_Motor_Maintenace.pdf5 pages

3 more files

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby