Gravity Sewer Replacement South Zone 2
Tybee Island, City OfTybee Island, Georgia#PE-62559-NONST-2027-000000037
Work includes installing new 8-inch PVC piping, new manholes, and associated construction. The contractor must maintain existing sewer service and provide temporary bypass pumping. Work must be substantially completed within 120 days and fully completed within 150 days after notice to proceed. Questions must be submitted by November 18, 2026. The successful bidder must be a Georgia licensed general contractor and provide a 5% bid bond, 100% performance bond, and 100% payment bond. Required submittals include a W-9, occupational tax certificate, E-Verify affidavit, SAVE affidavit, and a completed checklist.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery, courier
- Contract term
- one-time contract
- Documents analyzed
- 6 published · 2 analyzed
Scope of work
- Replace deteriorated gravity sewer mains with new 8-inch PVC piping
- Connect to existing sewer mains and manholes
- Abandon old sewer mains and manholes
- Remove and replace pavement
- Restore gravel roadways and stone bedding
Steps to Bid
- 1
Register and obtain the full bid package from Thomas & Hutton Engineering Co. for $200 (hard copy) or $25 (digital).
- 2
Attend the pre-bid meeting on November 16, 2026, at 11:00 AM at the Public Safety Building, 78 Van Horne Avenue. was Nov 16, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit questions by 5:00 PM on November 18, 2026, via email to Peter Gulbronson at [email available with Pro], with a copy to Tyler Davidek at [email available with Pro]. was Nov 18, 2026, 5:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Prepare the bid using the enclosed forms, ensuring all blanks are filled and all signatures are complete.
What you'll need
Contract duration
120 days after notice to proceed
Submission
Mail, Hand delivery, Courier
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Questions must be submitted by 5:00 PM on Wednesday, November 18, 2026, to Peter Gulbronson, PE, at [email available with Pro], with a copy to Tyler Davidek, PE, at [email available with Pro]. Responses will be distributed by 5:00 PM on Friday, November 20, 2026. A bid bond in the amount of 5% of the total contract amount is required. Performance and payment bonds, each in the amount of 100% of the total contract amount, are required prior to contract signing. The City may reject any bid or all bids, and may negotiate directly with any party submitting a bid.
Key dates
- Pre-bid meeting
- Nov 16, 2026, 11:00 AM Eastern Time
- Bids due
- Dec 2, 2026
Documents
- 202611_supportingdocs_PE-62559-NONST-2027-000000037-2026-11-03_09_19_19-ab3b.pdf22 pages
- 202611_supportingdocs_PE-62559-NONST-2027-000000037-2026-11-03_14_33_60-d831.pdf
- 202611_supportingdocs_PE-62559-NONST-2027-000000037-2026-11-03_14_33_63-36a1.pdf
- ITB2026-115 Gravity Sewer South Zone 2.pdf22 pages
- ITB 2026-115 - SS REPLACEMENT ZONE 2 BID SET.pdf
- ITB 2026-115 - Complete Full Set Specifications - Zone 2.pdf
More from this agency
- Gravity Sewer Replacement South Zone 1, Tybee Island, GA — closes Dec 2, 2026
Similar open bids
- 81800 - Plumbing Instructional Training Systems — State of Georgia Department of Administrative Services
- Materials Only – Water and Sewer Pipe, Valves, and Hydrants — Lagrange, City Of
- Sewer Grinder System Installation for Bryan County Detention Center — Bryan County Board Of Commissioners
- Water Meter Change Out - 2026 — Jones County Board Of Commissioners
- Trenchless Stormwater Pipe Rehabilitation at Holland View Drive — Hall County Board Of Commissioners
Closing this week nearby
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Resurface & Maintenance of SR 216 from SR 45 to SR 37 — closes Nov 20, 2026
- ADDENDUM NO. 1 – EXTENSION OF PROPOSAL DEADLINE — RFP 2026-03: Playground Equipment, Safety Surfacing, Delivery and… — closes Nov 20, 2026
- Playground Equipment, Safety Surfacing, Delivery and Installation — RFP No. 2026-03 — closes Nov 20, 2026