Building 2 Steam Station Replacement at West Haven VAMC
Department of Veterans Affairs — 241-NETWORK CONTRACT OFFICE 01 (36C241)Maine#36C24127Q0058
The VA Connecticut Healthcare System is seeking a qualified contractor to replace two non-functional steam pressure reducing stations in Building 2 at the West Haven VA Medical Center. The work includes full demolition of existing equipment, abatement of asbestos-containing materials, and installation of new, code-compliant steam stations. The contractor must comply with VA safety policies, including Lock-Out-Tag-Out and confined space entry procedures. A mandatory pre-bid walkthrough is required on November 14, 2026. Bids must be submitted electronically by December 3, 2026, at 10:00 AM EST. The contractor must be registered in SAM and VISTA. Work must be completed within 180 days of contract award.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 10:00 AM Eastern Time
- Submission
- Documents analyzed
- 1
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Remove leaking cross tee and install new steam-rated piping and fittings
- Install new steam regulators, flanges, gaskets, and bolting (ASTM A193)
- Replace downstream safety relief valves and modify discharge piping
- Provide new insulation for all disturbed or newly installed piping
- Conduct asbestos abatement for flanged connections with square-head bolts
Steps to Bid
- 1
Register in SAM and VISTA
- 2
Attend the mandatory pre-bid walkthrough on November 14, 2026, at 8:30 a.m. at the Building 16 Boiler Plant, West Haven VAMC was Nov 14, 2026, 8:30 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Review the Performance Work Statement and all attachments
- 4
Submit a completed copy of FAR 52.212-3, Offeror Representations and Certifications, via Official linkPro or as a written copy
- 5
Email the complete quote package to [email available with Pro] by December 3, 2026, at 10:00 AM EST by Dec 3, 2026, 10:00 AM
What you'll need
Contract duration
180 days from contract award and Notice to Proceed
Submission
NAICS
238220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The replacement must meet manufacturer specifications, including proper upstream/downstream straight-pipe distances, valve arrangements, strainer configurations, and safety relief valve sizing. All new piping must be Schedule 80, with double-in-series isolation valves and ASTM A193 bolts. Flanged connections with square-head bolts are suspected of containing asbestos and require abatement by a licensed professional. The contractor must comply with VA Connecticut Healthcare System Policy 138-075 (Lock-Out-Tag-Out) and SOP SO-010 (Confined Space Entry). A mandatory pre-bid walkthrough is required at 8:30 a.m. on November 14, 2026, at the Building 16 Boiler Plant. Submissions must be sent via email to [email available with Pro] by December 3, 2026, at 10:00 AM EST. All work must comply with VA Division 23 specifications, NFPA, OSHA, ASME, and applicable federal and state codes. The contractor is responsible for all labor, materials, equipment, supervision, testing, startup, commissioning, disposal, and incidental work. A full boiler plant steam outage will be scheduled for work execution between March 1, 2027, and May 31, 2027, with 30 days’ notice. All materials must be new unless approved otherwise. The contractor must also provide waste manifests, material certifications, and final submittals within 10 business days of completion.
Key dates
- Pre-bid meeting
- Nov 14, 2026, 8:30 AM Eastern Time
- Site visit
- Nov 14, 2026, 8:30 AM Eastern Time
- Bids due
- Dec 3, 2026
Documents
- 36C24127Q0058.docx
More from this agency
- Window Cleaning Services for VA Bedford Healthcare System Campus · closes Nov 27, 2026
- Fuel Oil and Diesel Delivery for Togus VA Medical Center · closes Nov 30, 2026
- R614--Shredding Contract-Bedford · closes Dec 7, 2026
- Build Elevator Tower for Building 25 – A/E Design Services (SF330 Request for Qualifications) · closes Dec 7, 2026
- Janitorial Floor Services for Bedford VA Medical Center · closes Dec 8, 2026
Similar bids in Maine
- Tree Street Resource & Discovery Center Construction · closes Dec 17, 2026
- Reconstruction of Southeast Corner Chimney at Victoria Mansion, a National Historic Landmark in Portland, Maine
- Pumping Septic Tanks, Floor Drains & Holding Tank Effluent Services · closes Dec 2, 2026
- Comprehensive District-Wide Studies · closes Jan 25, 2027
- Aluminum Patrol Boats · closes Dec 9, 2026
Closing soon in Maine
- Historic City Hall Seal Pediment Assessment, Removal, Stabilization, and Condition Evaluation · closes Nov 27, 2026
- Aviation Services for Marine Mammal Surveys · closes Nov 30, 2026
- S201--Aseptic Janitorial/or Custodial Services WRJ White River J · closes Dec 1, 2026
- Pre-Qualified Vendor List for Technical Assistance Materials · closes Dec 1, 2026
- Climate Costs Study · closes Dec 2, 2026