OpenIFBCloses Dec 1, 2026

Johnstone Complex Re-Roof

Montana State UniversityBozeman, Montana#26-1535

Montana State University is soliciting bids for the Johnstone Complex Re-Roof project (PPA No. 26-1535) in Bozeman, Montana. A pre-bid walk-through is scheduled for Monday, November 16, 2026, at 9:30 a.m. Bids equal to or greater than $150,000 require a bid security of 10% of the total bid. The successful bidder must provide a Performance Bond and a Labor & Material Payment Bond, each for 100% of the contract amount for contracts equal to or greater than $150,000. The project commencement date is May 10, 2027, with substantial completion by August 16, 2027. Prevailing wage rates apply.

On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 1, 2026
Time stated in bid documents
Dec 1, 2026, 2:00 PM Mountain Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
5 published · 4 analyzed

Scope of work

  • Demolition of existing roofing systems.
  • Installation of new Thermoplastic-Polyolefin (TPO) roofing system.
  • Installation of sheet metal flashing and trim.
  • Installation of roof specialties, manufactured gutters, and downspouts.
  • Installation of roof accessories, joint sealants, and expansion joint cover assemblies.
  • Painting of specified areas.

Steps to Bid

  1. 1

    Obtain Contract Documents from Montana State University University Facilities Management or online.

    [link available with Pro]

  2. 2

    Attend the Pre-Bid Walk-Through. was Nov 16, 2026, 9:30 AM

    This date has passed — confirm eligibility with the agency before bidding.

    Meet at the North Loading Dock of Harrison Hall. Service drive is accessible off College St.

  3. 3

    Submit questions. was Nov 24, 2026

    This date has passed — confirm eligibility with the agency before bidding.

    Questions received after this date will be responded to at the Owner's discretion.

  4. 4

    Submit sealed bids. by Dec 1, 2026, 2:00 PM

    Bids must be received and time-stamped in the Owner's office prior to the closing time.

What you'll need

Bid security

Required

For contracts equal to or greater than $150,000.00, a Performance Bond and a Labor & Material Payment Bond are required, each in the amount of 100% of the contract price.

Contract duration

Commence work May 10, 2027, and substantially complete by August 16, 2027.

Submission

Mail, Hand delivery

How to submit

Proposals shall be in a sealed envelope and addressed to the specified address. The envelope shall state that it contains a “BID PROPOSAL” and indicate the project name, location, MSU PPA Project Number, Name of Bidder, and acknowledge Addendum Number. Proposals received after the scheduled closing time will be rejected. Proposals must be time-stamped in the Owner’s office prior to the closing time.

In person/mail: STATE OF MONTANA, MONTANA STATE UNIVERSITY UNIVERSITY FACILITIES MANAGEMENT PLEW BUILDING 1ST FLOOR 516 W. GRANT ST. PO BOX 172760, BOZEMAN, MONTANA 59717-2760

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 9 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Project Manager: Donny Beebe. Consultant: A&E + SMA Design. Contract documents include State of Montana General Conditions, MSU Supplemental Conditions, Technical Specifications, and Construction Drawings. Key specifications cover Division 1 - General Requirements, Division 2 - Existing Conditions (Demolition), Division 6 - Wood, Plastics, & Composites (Miscellaneous Rough Carpentry), Division 7 - Thermal and Moisture Protection (Thermoplastic-Polyolefin (TPO) Roofing, Sheet Metal Flashing and Trim, Roof Specialties, Manufactured Gutters and Downspouts, Roof Accessories, Joint Sealants, Expansion Joint Cover Assemblies), Division 9 - Finishes (Painting), and Division 11 - Equipment (Facility Fall Protection). The project manual also references a pre-renovation asbestos inspection report. Construction drawings include cover sheets, general information, roof demolition plans, roof plans, and roof plan details.

Key dates

Questions due
Nov 24, 2026
Pre-bid meeting
Nov 16, 2026, 9:30 AM Mountain Time
Site visit
Nov 16, 2026, 9:30 AM Mountain Time
Bids due
Dec 1, 2026

Documents

  • 26-1535_Johnstone_Complex_Reroof_Project_Manual_FINAL.pdf284 pages
  • 26-1535_Invitation_To_Bid.pdf1 pages
  • 26-1535_Bid_Proposal.pdf3 pages
  • 26-1535_Plans.pdf8 pages
  • 26-1535_Johnstone_Re-Roof_Addendum_1.pdf

See all documents · Download with Pro

More from this agency

Similar bids near Bozeman

Closing soon near Bozeman