OpenRFPCloses Jan 21, 2027

Jorstad Substation 115 kV–12.47 kV, 15/20/25 MVA Power Transformer

Mason County PUD No. 1Shelton, Washington

Mason County PUD No. for five or more years. The transformer must be manufactured in the U.S. with over 55% U.S. component cost, and all iron, steel, and construction materials must be produced in the U.S. A bid bond of 5% of the bid amount is required. The successful bidder must provide a 100% performance and payment bond. Bids must be submitted by 3:00 p.m. PST via Zoom. The project is subject to prevailing wage requirements under Washington State law and the Davis-Bacon Act. Required certifications include Build America, Buy America (BABA), debarment and suspension, lobbying, and non-collusion.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 21, 2027
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, courier, hand delivery
Contract term
3 years + two additional one-year renewal terms
Documents analyzed
6 published · 5 analyzed

Steps to Bid

  1. 1

    Obtain bid documents from the Mason County PUD No. 1 website at Official linkPro or request a hard copy for a $250 nonrefundable fee.

  2. 2

    Obtain and complete the required certifications: BABA, debarment and suspension, lobbying, and non-collusion.

What you'll need

Submission

Mail, Courier, Hand delivery

NAICS

335912, 335913

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Mason County PUD No. The transformer must be manufactured in the United States with greater than 55% U.S. component cost, and all iron, steel, and construction materials must be produced in the U.S. Bidders must submit a certified check, bank cashier’s check, or bid bond in an amount not less than 5% of the bid amount. Bidders must have at least ten similar transformers in service in the U.S. for five or more years.

Key dates

Questions due
Jan 13, 2027, 3:00 PM Pacific Time
Bids due
Jan 21, 2027
Expected award
Feb 5, 2027

Documents

  • IFB-Jorstad-Substation-Power-Transformer.pdf15 pages
  • 20260917-MPUD1-Jorstad-Transformer-Specification-R1-Flattened.pdf33 pages
  • Attachment-B-_-Build-America-Buy-America-BABA-Certification-1.pdf1 pages
  • Attachment-C-Debarment-and-Suspension-Certification.pdf1 pages
  • Attachment-D-Certification-Regarding-Lobbying.pdf1 pages
  • Attachment-E-_-Non-Collusion-Affidavit.pdf1 pages

See all documents · Download with Pro

Similar bids near Shelton