Kautz Road Substation Construction, UIP Subproject 2-KRS
Department of Energy — FERMILAB - DOE CONTRACTORBatavia, Illinois#RFP-383167-CD
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
On PublicBidSearch: the original bid posting, 19 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 4:00 PM CT
Key dates
- Bids due
- Dec 18, 2026, 4:00 PM CT
Documents
- Amend_01_to_RFP_383167-CD.pdf3 pages
- 383167_RFP_1.0_RFP_Instructions_to_Offerors.pdf15 pages
- Exhibit_A-_Scope_of_Work-_UIP_Subproject_2_KRS.pdf3 pages
- download
- Exhibit_C-_Specification_Set.pdf
- Exhibit_D-_FFDG_General_Terms_and_Conditions_for_Construction_2810.2026_29.pdf25 pages
- Exhibit_E_-_Construction_Insurance_Requirements.pdf3 pages
- Exhibit_F_-_Statement_of_Acknowledgment_28SF-1413_29.pdf2 pages
11 more files
More from this agency
- Custom R&D Industrial Furnace — closes Dec 1, 2026
- PIP-II F-37 Building Low Conductivity Water (LCW) Pump Room Piping System Installation — closes Dec 3, 2026
- ANL Industrial Services Contract — closes Dec 7, 2026
- Utility Excavation and Repair Services IDIQ — closes Dec 7, 2026
- Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade — closes Dec 9, 2026
Similar open bids
- Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB — ENERGY, DEPARTMENT OF
- Request for Proposals (Solicitation of Alternate Proposals) for Village-owned Property - 17924 Halsted Street — Village of Homewood
- Repair Building Systems — AGRICULTURAL RESEARCH SERVICE
- Y1DZ--Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New… — VETERANS AFFAIRS, DEPARTMENT OF
Closing this week nearby
- PCC Sidewalk, Curb and Gutter, Driveway, and Roadway Improvement Work for ADA Compliance — Cove Avenue and Basin Drive… — closes Nov 20, 2026
- 2027 Janitorial Services for Municipal Buildings — closes Nov 20, 2026
- Lignite Coal Based Powdered Activated Carbon — closes Nov 20, 2026
- Notice to Bidders: Street Sweeping Services for the Village of Glendale Heights, Glendale Heights — closes Nov 20, 2026
- Street Sweeping Services — closes Nov 20, 2026