Keener Ridge Road Waterline Extension Project
Birch River Public Service DistrictWest Virginia
The Birch River Public Service District is seeking bids for the construction of a waterline extension on Keener Ridge Road, including 15,700 LF of 6-inch PVC pipe, 7,500 LF of 4-inch PVC pipe, 30 new service connections with meters and pressure-reducing valves, 15 fire hydrants, gate valves, and a potable water storage tank mixing system. Work must be completed within 120 days for substantial completion and 150 days for final payment. Bids must be submitted by January 12, 2027, at 2:00 p.m. local time, using a two-envelope system. A 5% bid guarantee bond is required. All bidders must hold a valid West Virginia contractor’s license. The project is partially funded by HUD CDBG and ARC. A pre-bid meeting is scheduled for December 15, 2026, at 2:00 p.m. at the Birch River PSD Office.
On PublicBidSearch: the newspaper notice, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 12, 2027
- Time stated in bid documents
- Jan 12, 2027, 2:00 PM Eastern Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Required submission items
- 4 items · full checklist with Pro
Steps to Bid
- 1
Register with Official linkPro and download the bidding documents for $150.
- 2
Obtain the bid forms and complete them on a unit price basis.
- 3
Prepare two envelopes: Envelope #1 with required bid documents; Envelope #2 with only the bid form and bid schedule.
- 4
Submit the sealed envelopes to the Birch River Public Service District at P.O. Box 509 or 153 Powells Creek Road, Birch River, WV 26610, by 2:00 p.m. local time on January 12, 2027. by Jan 12, 2027, 2:00 PM
What you'll need
Insurance
RequiredContractors are required to comply with all laws pertaining to the federal wage rates issued in accordance with the Davis Bacon Act.
Contract duration
120 calendar days to substantial completion
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Bids must be submitted using a two-envelope system: Envelope #1 contains the required bid documents; Envelope #2 contains only the bid form and bid schedule. All bids must be sealed and submitted by 2:00 p.m. local time on January 12, 2027.
In person/mail: P.O. Box 509, or 153 Powells Creek Road, Birch River, WV 26610
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The work includes furnishing all materials, labor, and necessary items for the construction and installation of approximately 15,700 linear feet of 6-inch PVC waterline, 7,500 linear feet of 4-inch PVC waterline, 30 new water service connections with meter settings and pressure reducing valves, 15 fire hydrants, gate valves, and all related appurtenances as outlined in the plans and specifications. The project also includes installation of a potable water storage tank mixing system and all other necessary work to create a complete and operational water distribution system. Bids must be submitted on the furnished bid forms, on a unit price basis, using a two-envelope system: Envelope #1 contains the required bid documents; Envelope #2 contains only the bid form and bid schedule. Bids will be received at the Birch River Public Service District office at P.O. Box 509 or 153 Powells Creek Road, Birch River, WV 26610, until 2:00 p.m. local time on January 12, 2027. The project is partially funded by HUD's CDBG through the WV Department of Economic Development's WV CAD office and the Appalachian Regional Commission (ARC). Contract completion is required within 120 calendar days for substantial completion and 150 calendar days for final payment readiness. A penalty of $1,000 per day applies for delays beyond the substantial completion date. All bids must be accompanied by a Bid Guarantee Bond for 5% of the total bid amount, or a certified check, cashier’s check, or letter of credit in the same amount. No bidder may withdraw their bid for 90 days after the bid opening. All bidders must hold a valid West Virginia contractor’s license under Section 21-11-11 of the West Virginia Code. A contractor’s license number must be included on the bid submission. The work is subject to Section 3 of the Housing and Urban Development Act of 1968, requiring compliance with HUD’s regulations in 24 CFR Part 75. Bidders must also comply with affirmative action and minority business enterprise requirements, Title VI of the Civil Rights Act of 1964, the Copeland Anti-Kickback Act, the Contract Work Hours and Safety Act, and the Drug-Free Workplace Provisions under West Virginia Code 21-1D-5. Contractors must comply with Davis-Bacon Act wage rates. The owner has tax exemption for all materials. Bidding documents are available from E.L. Robinson Engineering Company, 5088 Washington Street West, Charleston, WV 25313, or online at [link available with Pro] and [link available with Pro] for $150. Registration with [link available with Pro] is required to download digital documents.
Key dates
- Pre-bid meeting
- Dec 15, 2026, 2:00 PM Eastern Time
- Bids due
- Jan 12, 2027
Documents
- www.elrobinsonengineering.com
- www.questcdn.com
Similar bids in West Virginia
- Asphalt Paving, FANS 3279 – WV 10, Contract 2023060070 · closes Dec 8, 2026
- John Slack Park Multi-Sport Court Surfacing · closes Dec 14, 2026
- Concrete Box Beams, Bridge Rail and Components · closes Dec 9, 2026
- Madams Creek Waterline Extension Project – Jumping Branch-Nimitz Public Service District · closes Dec 10, 2026
- Asphalt Paving, Matewan Cinderella: 0.17 Miles S of Co 49/5 to Jct US 52, Contract 2023300020 · closes Dec 8, 2026
Closing soon in West Virginia
- Spraying Herbicides · closes Nov 30, 2026
- Solicitation of Interest for Real Estate Services · closes Dec 2, 2026
- 2025 or Newer SSV/PPV Police Package SUVs for CID · closes Dec 3, 2026
- 20809 Nov. 12,19 MORGANTOWN UTILITY BOARD Request for Proposals for Website Design and Development Rebuild The · closes Dec 4, 2026
- OneLogin SmartFactor SaaS Software Subscription, or Equal · closes Dec 4, 2026