OpenRFPCloses Dec 18, 2026

Kelley School AV Equipment and Installation

Indiana UniversityBloomington, Indiana#RFP-TEC-1967-2027

Indiana University is seeking a qualified vendor to supply and install audiovisual systems in 10 classrooms across Hodge Hall and Godfrey Graduate Center, Bloomington, IN. The project includes full integration of projectors, displays, microphones, cameras, control systems, and networked AV switching. All systems must be compatible with existing owner-provided equipment. Excluded work includes electrical, drywall, and millwork. Vendors must comply with IU’s cabling standards and provide a one-year on-site maintenance warranty. A mandatory site visit on December 4, 2026, at 10:00 AM EST is required; failure to attend results in automatic rejection. Proposals must be submitted via the Jaggaer supplier portal by 5:00 PM EST on December 18, 2026. Questions must be submitted by December 11, 2026.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 18, 2026
Submission
electronic portal
Documents analyzed
1

Scope of work

  • Install dual 8,000 lumen laser projectors in 10 classrooms
  • Mount 24-inch LCD monitors on lecterns and 65–75 inch rear confidence displays
  • Integrate wireless lapel mics, ceiling microphone arrays, and PTZ/ePTZ cameras
  • Deploy Q-SYS control systems, touch panels, and networked AV switching
  • Submit as-built schematics, equipment inventory, and turnover documentation

Steps to Bid

  1. 1

    Register on the Jaggaer supplier portal and complete the IU Public Bid Information form to gain access to the full RFP package.

  2. 2

    Attend the mandatory pre-proposal walkthrough on December 4, 2026, at 10:00 AM EST in the Godfrey Graduate and Executive Education Center main lobby elevators. by Dec 4, 2026, 10:00 AM

  3. 3

    Submit all questions via the Jaggaer Q&A board by 5:00 PM EST on December 11, 2026. by Dec 11, 2026, 5:00 PM

  4. 4

    Prepare and submit the full proposal via the Jaggaer supplier portal by 5:00 PM EST on December 18, 2026.

What you'll need

Submission

Electronic portal

How to submit

Submit via the Jaggaer supplier portal. Proposals must be received by 5:00 PM EST on December 18, 2026. Fax or telephone submissions are not accepted.

In person/mail: 2709 E 10th Street, Bloomington, IN 47408

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope includes full system integration, wiring, control, and commissioning for 10 rooms: Hodge Hall 2050, 4026, 4079, 4083; and Godfrey Graduate Center 2061, 2063, 2069, 2077. All systems must be compatible with existing owner-provided equipment (Dell PCs, keyboards, mice, Q-SYS programming). Excluded work includes electrical conduit, drywall repair, millwork, patching, painting, and all high-voltage wiring. Cabling must follow IU standards: shielded/unshielded Cat6+/Cat6A cables, Belden and Siemon components, keystone patch panels, and labeled cables with Velcro. Value-added services are encouraged, such as direct access to Tier 3 support, proactive system health reviews, and expedited escalation.

Key dates

Questions due
Dec 11, 2026, 5:00 PM Eastern Time
Pre-bid meeting
Dec 4, 2026, 10:00 AM Eastern Time
Site visit
Dec 4, 2026, 10:00 AM Eastern Time
Bids due
Dec 18, 2026
Expected award
Jan 6, 2027

Documents

  • rfp-tec-1967-2027-kelley-school-av.pdf22 pages

See all documents · Download with Pro

More from this agency

Similar bids near Bloomington

Closing soon near Bloomington