OpenConstructionCloses Dec 10, 2026

Kettler Hall and Ginsberg Hall Data Centers Fiber Optic Connection Pathway Installation - 2026

Purdue University Fort WayneFort Wayne, Indiana#C.20.10249

Purdue University Fort Wayne is soliciting bids for the installation of a fiber optic connection pathway between Kettler Hall and Ginsberg Hall data centers. The scope includes trenching, directional drilling, conduit and cable installation, termination, testing, and documentation. Bidders must register and sign in at the Eastern Engineering Plan Room to access the full plan set. Hard copies and a deposit check must be received before digital downloads are released. A pre-bid meeting is scheduled for 11/17/2026 at 9:00 AM ET. Bidders must submit a completed bid form, bid bond, and required questionnaires. The work will be performed on the Purdue University Fort Wayne campus in Fort Wayne, IN.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 10, 2026
Time stated in bid documents
Dec 10, 2026, 11:00 AM Eastern Time
Bid bond
10%
Submission
mail, hand delivery
Documents analyzed
2 published · 1 analyzed
Required submission items
8 items · full checklist with Pro

Steps to Bid

  1. 1

    Register and sign in at the Eastern Engineering Plan Room to access the full plan set.

  2. 2

    Submit a hard copy of the plan set and a deposit check to the Eastern Engineering Plan Room.

  3. 3

    Receive digital downloads of the plan set after the hard copy and deposit check are processed.

  4. 4

    Attend the pre-bid meeting on 11/17/2026 at 9:00 AM ET. was Nov 17, 2026, 9:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  5. 5

    Prepare and submit the bid package by 12/10/2026 at 11:00 AM ET. by Dec 10, 2026, 11:00 AM

What you'll need

Submission

Mail, Hand delivery

NAICS

238290, 541512

How to submit

All submissions must be delivered to the Eastern Engineering Plan Room. Bidders must register and sign in to access the full plan set. Hard copies and a deposit check must be received before digital downloads are released. Bidders must submit a completed bid form, bid bond, and required questionnaires. The bid must be received by 12/10/2026 at 11:00 AM ET. The bid must be sealed and marked 'BID - Kettler Hall and Ginsberg Hall Data Centers Fiber Optic Connection Pathway Installation - 2026'.

In person/mail: Eastern Engineering Plan Room, 1000 East Main Street, Fort Wayne, IN 46802

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 8-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project is located on the Purdue University Fort Wayne campus. All bidding documents are provided loose with the specification, and bidders must submit a completed bid form, bid bond, and required questionnaires. The project is governed by AIA A101-2017 and Purdue University contract forms.

Key dates

Pre-bid meeting
Nov 17, 2026, 9:00 AM Eastern Time
Bids due
Dec 10, 2026

Documents

  • Kettler_Hall_and_Ginsberg_Hall_Data_Centers_Fiber_Optic_Connection_Pathway_I.pdf
  • Kettler_Hall_and_Ginsberg_Hall_Data_Centers_Fiber_Optic_Connection_Pathway_I.pdf2 pages

See all documents · Download with Pro

Similar bids near Fort Wayne

Closing soon near Fort Wayne