Kidd Brewer Stadium East Side Lower Bowl Replacement (Solicitation for Design-Build Services)
Unc - System OfficeNorth Carolina#68-20090-DB
The project involves full demolition and reconstruction of the seating area with improved safety, accessibility, and field proximity. The new design includes wider aisles, expanded ADA seating, a wider concourse, and premium loge boxes. The project budget is $10,000,000. The designer on the team must be licensed in North Carolina. A pre-proposal meeting is scheduled for December 1, 2026, at 11:00 AM at the east gate of the stadium. Proposals must be delivered to the project manager at Appalachian State University.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 11, 2026, 3:00 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 36 months + Two additional one-year renewal terms
- Documents analyzed
- 1
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Replace East Side lower bowl seating with new concrete and bleachers
- Expand seating toward SE corner to offset 205 seat loss
- Incorporate premium loge boxes at top of new seating section
- Ensure ADA-compliant seating and improved safety standards
Steps to Bid
- 1
Attend the pre-proposal meeting on December 1, 2026, at 11:00 AM at the east gate of Kidd Brewer Stadium. by Dec 1, 2026, 11:00 AM
- 2
Submit a complete proposal to the project manager at Appalachian State University by 3:00 PM on December 11, 2026. by Dec 11, 2026, 3:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
236220, 541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The existing lower bowl, over 60 years old, is in very poor condition and no longer meets modern safety, accessibility, and operational standards. The scope includes full demolition of the current structure and construction of a new seating area with upgraded concrete and bleacher components. The new design will position seating closer to the field, feature a wider concourse, improved ADA-compliant seating, and wider aisle spacing between rows. The project will result in a net loss of approximately 205 seats, which must be offset by expanding the seating section toward the southeast corner of the stadium.
Key dates
- Pre-bid meeting
- Dec 1, 2026, 11:00 AM Eastern Time
- Bids due
- Dec 11, 2026
Documents
- ASU_Kidd_Brewer_East_Side_Lower_Bowl_Rplcmnt-20090-DB.pdf1 pages
More from this agency
- South Campus Recreation Complex - Tennis Court Modifications · closes Dec 14, 2026
- Taylor Student Health - Elevator Modernizations · closes Dec 14, 2026
- Plemmons Commissary Renovation · closes Dec 15, 2026
- Tri-Towers Mechanical Systems Update (Construction Bid Solicitations from Prequalified Contractors) · closes Dec 15, 2026
- Engineering Classroom Building (Architecture Services - Lead Designer) · closes Dec 15, 2026
Similar bids in North Carolina
- Project Engineer The Little Switzerland Community Association is seeking professional engineering services · closes Dec 16, 2026
- PROCUREMENT OF DESIGN-BUILD SERVICES
- Thimble Shoal Channel Maintenance Dredging · closes Jan 5, 2027
- Request for Qualifications: Classroom Additions at Carver Elementary School, Grantham Elementary School, and Spring… · closes Jan 21, 2027
- RFQ 6858 AE Services- Safe School Entry Upgrade
Closing soon in North Carolina
- demolition of the former Avery County Senior Center and Avery County Administration Building · closes Nov 30, 2026
- Lake Louise Park Improvements · closes Dec 1, 2026
- Recycling Services · closes Dec 1, 2026
- Contract Lifecycle Management System · closes Dec 2, 2026
- Repair Auto Maintenance Facility Bldg 575 · closes Dec 2, 2026