Kitchen Modernization Project at Beechwood School, Orangethorpe Elementary School, and Robert C. Fisler School
Fullerton School DistrictFullerton, Orange, California#FSD 2026-2027-BOND-03
The Fullerton School District is seeking qualified contractors to modernize kitchens at three schools—Beechwood, Orangethorpe Elementary, and Robert C. Fisler—via lease-leaseback. A mandatory job walk on November 18, 2026, at 9:00 AM at all three school sites is required; attendance at all stops is mandatory. The successful bidder must provide 100% Performance and Payment Bonds. Prevailing wage rates under California Labor Code must be paid. Contractors must comply with the Project Labor Agreement and acknowledge any addenda.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 8, 2026
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 2 published · 1 analyzed
- Required submission items
- 4 items · full checklist with Pro
Steps to Bid
- 1
Attend the mandatory job walk on November 18, 2026, at 9:00 AM at all three school sites: Orangethorpe Elementary, Robert C. Fisler Elementary, and Beechwood Elementary. was Nov 18, 2026, 9:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Insurance
RequiredThe successful contractor and its subcontractors must also comply with all provisions in the Project Labor Agreement that the District is implementing on this Project.
Submission
Mail, Hand delivery
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Fullerton School District is soliciting qualifications and proposals for construction and preliminary/preconstruction services for kitchen modernization at three school campuses: Beechwood School, Orangethorpe Elementary School, and Robert C. Fisler School. The project will be delivered via the lease-leaseback method (Ed. Code, § 17406). A mandatory job walk is required on November 18, 2026, at 9:00 AM, with stops at Orangethorpe Elementary School (1400 S. Brookhurst Rd., Fullerton, CA 92833), Robert C. Fisler Elementary School (1350 Starbuck St., Fullerton, CA 92833), and Beechwood Elementary School (780 Beechwood Ave, Fullerton, CA 92835). Contractors must attend all three stops; failure to attend will result in disqualification. Prevailing wage rates under California Labor Code sections 1770 et seq. must be paid. Contractors must also comply with the Project Labor Agreement and all registration/qualification requirements under sections 1725.5 and 1771.1 of the California Labor Code. Contractors are responsible for acknowledging receipt of any addenda issued.
Key dates
- Pre-bid meeting
- Nov 18, 2026, 9:00 AM Pacific Time
- Site visit
- Nov 18, 2026, 9:00 AM Pacific Time
- Bids due
- Dec 8, 2026
Documents
- FINAL_PDF__MM_Fullerton_SD_-_LLB_Advertisement-School_Site_Kitchens-21_Oct._.pdf1 pages
1 agency-portal link
More from this agency
- Beechwood School Modulars Project · closes Dec 8, 2026
- Gymnasium Replacement Project at Robert C. Fisler School · closes Dec 8, 2026
Similar bids near Fullerton
- Arovista Elementary School Modular Replacement and Site Improvements Project · Brea · closes Dec 1, 2026
- List of Qualified Contractors for Informal Projects (Up to $200,000) — Calendar Year 2026 · Tustin · closes Dec 31, 2026
- General Contractor Pre-Qualification for Tustin Police Department Locker Room Renovation Project · Tustin · closes Dec 22, 2026
- Arroyo High School Phase 2 Modernization (New Theatre & Administration Building) Project · El Monte · closes Jan 14, 2027
- Doors/Related Hardware and Installation Services · Santa Ana · closes Dec 1, 2026
Closing soon near Fullerton
- Parking and Data Processing Services for the City of Norwalk · Norwalk · closes Nov 30, 2026
- Citrix Universal for Hybrid Multi Cloud Annual Maintenance Renewal · Orange · closes Dec 3, 2026
- Grand Avenue Rehabilitation from 1st Street to Santa Ana Boulevard · Santa Ana · closes Dec 3, 2026
- Mobile Home Tenant Based Rental Assistance (MHTBRA) Program · Huntington Beach · closes Dec 3, 2026
- Hydrogen-Based Zero-Emission On-Road Mobile Source Technology Development, Demonstration, Deployment, Workforce… · Diamond Bar · closes Dec 4, 2026