Kitchen Stove and Oven Replacement at Chor Bishop Joseph Eid Apartments (667-3), Fall River, MA
Fall River Housing AuthorityMassachusetts
The Fall River Housing Authority is soliciting sealed electronic bids for the replacement of gas stoves with electric stoves at the Chor Bishop Joseph Eid Apartments (667-3) in Fall River, MA. The scope includes removal of gas service lines and demolition of existing stoves. A bid deposit of 5% of the maximum bid amount is required. A pre-bid site visit is scheduled for 12/02/2026 at 10:00 AM EST at 33 Quequechan Street, Fall River, MA. Bids must be submitted online at [link available with Pro].
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Feb 10, 2027
- Time stated in bid documents
- Feb 10, 2027, 2:00 PM Eastern Time
- Bid bond
- 5%
- Submission
- online portal
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Remove and demolish existing gas service lines and stoves
- Install new electric stoves with proper electrical and ventilation connections
Steps to Bid
- 1
Register as an electronic bidder on Official linkPro
- 2
Review and download bid documents from Official linkPro
- 3
Attend the pre-bid conference and site visit on 12/02/2026 at 10:00 AM EST at 33 Quequechan Street, Fall River, MA by Dec 2, 2026, 10:00 AM
- 4
Submit general bid online at Official linkPro by 10 February 2027 at 2:00 PM EST by Feb 10, 2027, 2:00 PM
What you'll need
Insurance
RequiredBids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive.
Submission
Online portal
NAICS
238290, 238999
How to submit
Bids must be submitted online at Official linkPro. All bidders must register as electronic bidders prior to submission. Hard copy bids will not be accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The Fall River Housing Authority invites sealed bids from contractors for the replacement of existing gas stoves with electric stoves at the State Aided Development: Chor Bishop Joseph Eid Apartments (667-3), located in Fall River, Massachusetts. The project is estimated to cost $638,000.00. This project is being electronically bid; hard copy bids will not be accepted. General bids are due by 10 February 2027 at 2:00 PM EST. A bid deposit of at least 5% of the greatest possible bid amount (including all alternates) is required for general and sub-bids. The project is subject to M.G.L. c.149 §44A-J and minimum wage requirements under M.G.L. c.149 §§26 to 27H. The workforce participation benchmark is 6.9% women and 15.3% minorities, as required by MGL c. 149 § 44A(2)(G). Contract documents are available for review and download at [link available with Pro]. The hard copy documents may be viewed at Nashoba Blue Inc., 433 Main Street, Hudson, MA 01749.
Key dates
- Questions due
- Jan 27, 2027, 12:00 PM Eastern Time
- Pre-bid meeting
- Dec 2, 2026, 10:00 AM Eastern Time
- Site visit
- Dec 2, 2026, 10:00 AM Eastern Time
- Bids due
- Feb 10, 2027
More from this agency
- Security Guard Services for Part-Time Guarding at Two Locations · closes Dec 7, 2026
- Boiler Replacement at Corky Row 705-2 · closes Dec 28, 2026
- Boiler Replacement · closes Dec 28, 2026
- Boiler Replacement at State Aided Development: Corky Row (705-2) · closes Dec 28, 2026
- Kitchen Stove/Oven Replacement at Bishop Eid #095190 · closes Feb 10, 2027
Similar bids in Massachusetts
- 15 kV Switchgear Assembly, Station 41 · closes Dec 10, 2026
- RFP No. 27E-10-27: 15 kV Switchgear Assembly for Station 41 · closes Dec 10, 2026
- 12 Channel Street Electrical Service Upgrade · closes Jan 5, 2027
- Switchboard Replacement at Meadowcrest, Kingston, MA (Project #145042) · closes Jan 8, 2027
- Emergency Generator Maintenance
Closing soon in Massachusetts
- Line Truck Lift Equipment Inspection, Preventative Maintenance and Repair Service · closes Dec 2, 2026
- Alford Street Facility Seawall Repair · closes Dec 2, 2026
- HVAC Classroom Renovation at MCC Bedford Campus · closes Dec 2, 2026
- Contract PW-27-06 Brush Mowing · closes Dec 3, 2026
- Ice Machine Disinfection Maintenance Agreement with 4 (1-year option periods) · closes Dec 3, 2026