Kona Bridge FAS Erosion Control
Montana Fish, Wildlife & Parks — Design & ConstructionMontana#7236121
The project includes earthwork, installation of streambank treatments using large and small woody materials, stone toe, ballasting boulders, alluvial infill, rock stairs, fences, bollards, and seeding. The Contractor must submit a Water Management Plan 21 days prior to work below elevation 3,080’. All submittals must be submitted 14 days prior to delivery. Work is restricted to regular hours (7:30 AM – 5:30 PM, Mon–Fri), with heavy equipment only allowed during a temporary site closure. The Contractor must provide a 24/7 emergency contact. The project is in a FEMA floodway, requiring strict grading tolerances. The Contractor is responsible for all site access, staging, erosion control, and compliance with federal and state permits.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (email) for this bid.
Contact
Agency contact for this bidEmail — included with ProProOverview
- Due
- Dec 17, 2026
- Time stated in bid documents
- Dec 17, 2026, 3:00 PM Mountain Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 120 calendar days from Notice to Proceed
- Documents analyzed
- 4 published · 3 analyzed
Scope of work
- Install 100 linear feet of large woody matrix streambank treatment
- Install 50 linear feet of small woody matrix streambank treatment
- Furnish and install 30 ballasting boulders
- Furnish and install 275 square feet of rock stairs
- Install 9 safety bollards
- Install 200 linear feet of 6-foot fence
Steps to Bid
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Project location: near Missoula, MT. Pre-bid meeting: 12/2/2026. Sealed bid opening: 12/17/2026. The work includes mobilization, installation of turbidity control, removal of 3 large trees, earthwork (cut and fill, and surplus material), furnishing and installing stone toe, large woody material, small woody material, willow cuttings, ballasting boulders, alluvial infill, large and small woody matrix streambank treatments (100 linear feet and 50 linear feet respectively), rock stairs, safety bollards, 6-foot and temporary fences, broadcast seeding, and surface roughness and woody debris placement. All materials must meet specific gradation, size, and species requirements. Work below elevation 3,080’ is prohibited until the Water Management Plan is approved. The project is located in a FEMA-designated floodway, requiring tight grading tolerances (0.20’ horizontal, 0.10’ vertical). The Contractor must coordinate with the Engineer for staking and field support. All work must be performed in compliance with the Montana Public Works Standard Specifications, Seventh Edition, April 2021, with modifications specified in the Special Provisions.
Key dates
- Questions due
- Dec 1, 2026
- Pre-bid meeting
- Dec 2, 2026, 11:00 AM Mountain Time
- Bids due
- Dec 17, 2026
- Expected award
- Jan 15, 2027
Documents
- website-project-manual-7236121.pdf
- special-provisions.pdf30 pages
- drawings.pdf12 pages
- bid-envelope.pdf3 pages
More from this agency
- Kelly Island FAS Erosion Control · closes Dec 15, 2026
Closing soon in Montana
- Invitation To Bid: construction of the Two-Mile Bridge Repair · closes Nov 30, 2026
- Computer-Assisted Mass Appraisal (CAMA) System Replacement · closes Dec 1, 2026
- Public Water System Technical, Financial & Managerial Assistance · closes Dec 1, 2026
- Hamilton Hall Life-Safety Improvements and 3rd & 4th Floor Renovations, Montana State University, Bozeman, MT · closes Dec 3, 2026
- Construction of the Tongue and Yellowstone River Irrigation District Jones Creek Flume Replacement Project · closes Dec 5, 2026