OpenIFBCloses Dec 3, 2026

La Palma Alleys Sewer Improvement Project

City of Anaheim — Public WorksAnaheim, California#RCP2023-21228

The City of Anaheim is seeking proposals to identify solutions for operational deficiencies in the sewer system along La Palma Avenue, including a siphon between manholes SW070319 and SW071102 and another between SW070314 and SW071101. The project addresses aging 6-inch diameter sewer lines that fall below current standards, suffer from root intrusion and offset joints, and includes a siphon issue where a 21-inch line is at a lower elevation than a 10-inch line. The successful bidder will deliver a Preliminary Design Report (PDR) with feasible solutions. The work is located in Anaheim, California.

On PublicBidSearch: the original bid posting for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 2:00 PM Pacific Time

Steps to Bid

  1. 1

    Review the solicitation and all attached exhibits, including Exhibit A, which shows the project area.

  2. 2

    Submit questions to the City of Anaheim Public Works department by the deadline specified in the solicitation.

  3. 3

    Submit a complete proposal, including the Preliminary Design Report (PDR), by the due date and time. by Dec 3, 2026, 2:00 PM

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The City of Anaheim Public Works Operations team has identified a previously unknown sag or siphon between manholes SW070319 and SW071102 on La Palma Avenue, which has caused operational issues. This project will identify solutions to remove this operational deficiency. The sewer systems in the area were constructed with a 6-inch minimum diameter, below the City’s current minimum standard of 8 inches. The existing 6-inch pipe is experiencing significant maintenance problems, including offset joints and root intrusion, and its improvement is a priority. The project also aims to remove the existing siphon from manhole SW070314 to SW071101 at the intersection of La Palma Avenue and Harbor Boulevard. City survey data shows the 21-inch sewer line on the south side of La Palma Avenue is at a lower elevation than the 10-inch sewer line. The identification of feasible solutions to remove the siphon is required in the Preliminary Design Report (PDR).

Key dates

Bids due
Dec 3, 2026

More from this agency

Similar bids near Anaheim

Closing soon near Anaheim