Lift Station #1 Seawall Replacement-Repair Project
City of CocoaCocoa, Brevard, Florida#B-27-06-COC
The City of Cocoa is soliciting bids for the repair and replacement of approximately 60 linear feet of deteriorated seawall at Lift Station No. 1, located at 210 Riverside Drive, Cocoa, Florida. The scope includes demolition of the existing seawall, installation of new sheet piling with tiebacks and a poured-in-place concrete cap, temporary erosion control, site restoration, and coordination with utility and environmental requirements. Bidders must be familiar with site conditions, obtain all required permits, and provide a work schedule upon award. The project is governed by the City of Cocoa’s construction specifications and plans, referenced as Exhibit A.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 6, 2027
- Time stated in bid documents
- Jan 6, 2027, 3:00 PM Eastern Time
- Submission
- mail, hand delivery
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Maintain and modify existing stormwater outfall pipe into Indian River Lagoon
- Implement temporary erosion control (turbidity barriers, silt fencing, floating curtains)
- Conduct site restoration, backfilling, and final clean-up
- Obtain all required local, state, and environmental permits prior to work
Steps to Bid
- 1
Review the full solicitation and all referenced plans and specifications (Exhibit A) prior to submitting a bid.
- 2
Submit all required bid documents, including the completed bid form, bid bond, and any other required submittals, by the due date and time. by Jan 6, 2027, 3:00 PM
- 3
Attend the pre-bid meeting on December 2, 2026, at 5:00 PM (ET) if required or encouraged. by Dec 2, 2026, 5:00 PM
- 4
Submit any questions to the designated contact by December 11, 2026, at 5:00 PM (ET). by Dec 11, 2026, 5:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130
How to submit
Bids must be submitted in a sealed envelope marked 'Bid for Lift Station #1 Seawall Replacement-Repair Project, B-27-06-COC' and delivered to the City of Cocoa, 210 Riverside Drive, Cocoa, FL 32922, or sent via certified mail. Electronic submission is not accepted unless otherwise specified.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The Contractor shall furnish all necessary labor, materials, equipment, supervision, and incidentals required to complete the City of Cocoa Lift Station No. 1 Seawall Replacement-Repair Project. Mobilization and General Requirements • Description: Includes all initial activities, administrative setups, and facility provisions necessary to mobilize personnel, equipment, and materials to the site. • Key Tasks: o Obtain all required local, state, and environmental permits prior to construction start. o Establish temporary project signage, safety fencing, and secure staging/storage areas around Lift Station 1. o Implement maintenance of traffic (MOT) plans if construction access impacts local roadways or public right-of-ways. o Coordinate utility locates (Sunshine 811) and protect existing on-site electrical, water, and wastewater infrastructure. Temporary Erosion Control • Description: Installation and maintenance of Best Management Practices (BMPs) to prevent sediment runoff and protect adjacent waterways (e.g., the Indian River Lagoon) during construction. • Key Tasks: o Install turbidity barriers, silt fencing, and floating silt curtains around the marine work zone. o Maintain and inspect erosion control devices daily, especially after heavy rain events, throughout the duration of the project. o Remove and properly dispose of all temporary erosion controls once final site stabilization is achieved. Excavation and Site Work • Description: Controlled excavation, grading, and removal of existing failed structure elements to prepare for the new alignment. • Key Tasks: o Carefully demolish and haul away approximately 60 linear feet of the deteriorated existing seawall structure (and legacy cap/panels). o Perform necessary localized earthwork, soil excavation, and grading behind the new wall alignment to facilitate tieback and cap installation. o Backfill and compact subgrades safely around critical lift station infrastructure without causing structural settlement or utility disruption. Sheet Pile Material and Installation • Description: Procurement, driving/installation, and capping of roughly 60 linear feet of heavy-duty sheet piling designed for marine durability and structural load support. • Key Tasks: o Supply specified sheet pile materials (e.g., vinyl, composite, or reinforced concrete/steel per engineering design) engineered for local tidal ranges and soil conditions. o Drive or vibrate sheet piles to the specified design depth along the 60 linear foot alignment. o Install corresponding tieback systems, deadmen, wales, and a robust poured-in-place concrete or composite seawall cap to lock the system together. Site Restoration, Final Clean Up, and Demobilization • Description: Restoring the work area to its original or improved condition, removing equipment, and completing final project closeout. • Key Tasks: o Backfill remaining voids, grade disturbed earth, and restore ground surfaces (e.g., sodding, gravel replacement, or concrete flatwork repair). o Remove all construction equipment, remaining materials, temporary facilities, and structural debris from the site. o Conduct a thorough final clean-up of the work area, including sweeping access paths and removing temporary turbidity curtains once water conditions stabilize. All work shall be constructed according to the Construction Plans and Specifications and are made part of the contract by reference as Exhibit A. The Contractor shall construct the project per: • The jurisdiction for the project site is the City of Cocoa, Florida. All work shall be permitted and undertaken in accordance with applicable codes and ordinances. • Prime contractor is assumed to be familiar with all general condition’s/contract requirements associated with the contract between owner and contractor as they apply to the work noted on the detailed construction plans and specifications, attached herein as Exhibit A.[DK2.1][JF2.2][BD2.3][DK2.4] Prime contractor shall transfer all such requirements to all subcontractors. • All contractors shall examine job site prior to submission of a bid to observe all visible existing conditions. Submission of bid will be taken to confirm familiarity with conditions of the work, so the bid price includes all work necessary to provide a completed, ready-to-occupied project. • Contractor shall obtain all permits required to undertake the work unless noted otherwise. • Prior to receiving a notice-to-proceed, the owner will file a notice-of-commencement with appropriate authority. • The contractor shall deliver a work schedule immediately after receiving a notice of award showing all tasks and completion dates.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 5:00 PM Eastern Time
- Bids due
- Jan 6, 2027
More from this agency
- Onsite Instrument Calibration Services (Request for Information) · closes Nov 30, 2026
Similar bids near Cocoa
Closing soon near Cocoa
- Ventilation System Diagnostic and Maintenance Services · Orlando · closes Nov 26, 2026
- Wyld Haven Drive Phase 1 and Phase 2 Roadway Project · Orlando · closes Dec 1, 2026
- Request For Proposal (RFP) for NASA Agency-wide Supply of Liquid and Gaseous Helium · Orlando · closes Dec 1, 2026
- Lift Station No. 115 Rehabilitation · Orlando · closes Dec 2, 2026
- Carpet Replacement · Melbourne · closes Dec 2, 2026