BTCS is seeking a qualified contractor to renovate 1,950 sq. ft. at its Lockhart facility into a modern Training Center with a large Training Studio, Control Room, Kitchenette/Demonstration Room, Breakout Room, and ADA-compliant restrooms. The scope includes interior renovations, electrical and HVAC relocations, fire alarm modifications, and full AV integration with Microsoft Teams Room systems, 4K displays, ceiling-array and table-array microphones, PTZ cameras, and centralized control. The contractor must deliver a turnkey solution including permitting, inspections, system testing, staff training, and documentation. Proposals must be submitted by email to [email available with Pro] by 3:00 PM CST on December 4, 2026. Questions must be received by November 27, 2026. The selected vendor will be notified on January 26, 2027, with an estimated completion date of August 15, 2027. A completed HUB Questionnaire is required. The contractor must provide comprehensive insurance, including $1M per occurrence general liability, $1M workers’ compensation, $1M cyber/privacy liability, $1M professional liability, and $1M umbrella liability.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 4, 2026, 5:00 PM CT
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
email
Contract term
3 years + two additional one-year renewal terms
Documents analyzed
1

Scope of work

  • Install two 4K commercial displays, ceiling-array microphones, and wireless presenter microphones in the Training Studio
  • Install a freestanding equipment rack, three 4K monitors, and a touch-panel controller in the Control Room
  • Install a PTZ camera, 4K display, and integrated audio in the Kitchenette/Demonstration Room
  • Install a 4K display, table-array microphone, and ceiling-mounted speaker in the Breakout Room
  • Provide a turnkey solution including all labor, materials, equipment, installation, programming, integration, cabling, testing, commissioning, permitting, and

Steps to Bid

  1. 1

    Register with BTCS and obtain access to the RFP document.

  2. 2

    Review the RFP, including attachments (HUB Questionnaire, Insurance Requirements, Site Map, Floor Plans).

  3. 3

    Submit questions to Monica Rodriguez, Director of Contract Services, via email to [email available with Pro] by 3:00 PM CST on November 27, 2026. by Nov 27, 2026, 3:00 PM

  4. 4

    Prepare and complete the proposal, including all required sections: Project Approach, Vendor Organization, References, and Pricing.

  5. 5

    Complete and submit the HUB Questionnaire (Attachment A).

  6. 6

    Ensure all required insurance documentation is included (Attachment B).

  7. 7

    Submit the complete proposal via email to [email available with Pro] by 3:00 PM CST on December 4, 2026.

What you'll need

Submission

Email

NAICS

238290, 541512, 541513

How to submit

Submit the complete proposal via email to [email available with Pro]. The proposal must be clearly marked as a response to the RFP. The time on the received email will be considered the submission time. The proposal is not considered received until it is in the possession of the Contracts Management office.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

ft. of space at its Lockhart facility (2060 S. Colorado St.) into a fully integrated Training Center. The project includes interior renovations (reconfiguring walls, installing acoustical ceilings, flooring, lighting, ADA restroom modifications, signage), relocating electrical, HVAC, and fire alarm systems, and installing modern audio/visual (AV) technology. The Training Studio (Rooms 17–19, 23) will be equipped with two 4K commercial displays, ceiling-array microphones, wireless presenter microphones, a Microsoft Teams Room interface, and automated speaker-tracking cameras. The Control Room (Rooms 21–22) will include a freestanding equipment rack, three 4K monitors, a control processor, touch-panel controller, and multiple HDMI inputs. Proposals must include a completed HUB Questionnaire (Attachment A), proof of insurance (Attachment B), and site map and floor plans (Attachments C and D). The selected contractor will subcontract for AV equipment and installation to enable live streaming and recording to multiple rural locations.

Key dates

Questions due
Nov 27, 2026, 3:00 PM Central Time
Bids due
Dec 4, 2026, 5:00 PM CT
Expected award
Jan 26, 2027

Documents

  • Lockhart-Training-Center-RFP.pdf19 pages

See all documents · Download with Pro

More from this agency

Similar bids near Round Rock

Closing soon near Round Rock