LSDC Overlay, Approach Pavement, Berm Repair, Modify End Block, Joint Replacement, Rip Rap
South Dakota DOT — SDDOTHarding, Perkins, South Dakota#07WM
The tentative letting date is December 2, 2026. Substantial completion is due October 29, 2027, and field work completion is due November 24, 2027.
On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (email) for this bid.
Contact
Agency contact for this bidEmail — included with ProProOverview
- Due
- Dec 2, 2026, 11:59 PM CT
- Bid bond
- Bond required.
- Submission
- electronic portal
- Documents analyzed
- 8 published · 4 analyzed
Scope of work
- LSDC Overlay
- Approach Pavement
- Berm Repair
- Modify End Block
- Joint Replacement
Steps to Bid
What you'll need
Bid security
RequiredBond required.
Contract duration
SUBSTANTIAL COMPLETION: OCTOBER 29, 2027, FIELD WORK COMPLETION: NOVEMBER 24, 2027
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This project involves LSDC Overlay, Approach Pavement, Berm Repair, Modify End Block, Joint Replacement, and Rip Rap on SD79, located 21.4 miles south of the SD20 Junction over the Moreau River. The project is tentatively scheduled for letting on December 2, 2026, with substantial completion required by October 29, 2027, and field work completion by November 24, 2027. Central time on December 2, 2026. The project category is Category I, the project type is Structural, and the geographic zone is Zone 1. Work Type is WORK TYPE 8.
Key dates
- Bids due
- Dec 2, 2026, 11:59 PM CT
Documents
- 111826tentquarter.pdf3 pages
- 120226tentquarter.pdf3 pages
- WorkTypes.pdf1 pages
- 07WM_SpecProv.pdf86 pages
- 07WM_SectionA.pdf
- 07WM_SectionC.pdf
- 07WM_SectionE.pdf
- 07WM_SectionF.pdf
More from this agency
- Modify Intersection · closes Dec 2, 2026
- Grading, PCC Sidewalk & Culverts - Box Elder · closes Dec 2, 2026
- Median Crossovers - I29 N & S - 0.5 S & 0.5 N of Exit 82 (Benson Rd) · closes Dec 2, 2026
- Asphalt Surface Treatment - Custer Area · closes Dec 9, 2026
- Structure (101' Steel Girder) Removal - Structure over Mickelson Trail in Hill City · closes Dec 9, 2026
Similar bids in South Dakota
- WCFO Tuckpointing Exterior Facade · closes Dec 16, 2026
Closing soon in South Dakota
- Department of Human Services Rate Methodology · closes Nov 30, 2026
- TSL Grant Technical Assistant Provider · closes Nov 30, 2026
- Contractor Operated Civil Engineer Supply Store (COCESS) at Ellsworth AFB, SD — Indefinite Delivery, Indefinite… · closes Dec 1, 2026
- Sourcewell Food Products & Distribution for School Food Authorities · closes Dec 3, 2026
- Strategic Apprenticeship Facilitator for High School Apprenticeships · closes Dec 4, 2026