OpenIFBCloses Dec 1, 2026, 2:00 PM CT

Furnish Maintenance Workers for FTCC Facilities

L.E. Fletcher Technical Community College — L.E. Fletcher Technical Community College - (3)Louisiana#40004-23072

The contractor is responsible for all hiring, background checks, payroll, benefits, and workers’ compensation. Bids must be submitted sealed and signed by December 1, 2026, at 2:00 PM CT. A mandatory pre-bid site visit is required on November 20, 2026, at 8:00 AM at all four campuses. The contract runs from award through June 30, 2027, with two 12-month renewal options. The bid is for a lump sum hourly rate, with estimated hours of 8,320 for four workers, 2,080 for an additional worker, and 100 for overtime. The College may adjust staffing levels dynamically. All services must be ADA compliant and meet federal and state labor standards.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 1, 2026, 2:00 PM CT
Time stated in bid documents
Dec 1, 2026, 2:00 PM Central Time
Submission
mail, hand delivery
Contract term
from the date of award through June 30, 2027 + two additional 12-month renewal terms
Documents analyzed
1
Required submission items
5 items · full checklist with Pro

Scope of work

  • Provide four general laborers with a vehicle for travel between campus locations
  • Perform physical maintenance tasks including event setup/teardown, furniture moving, pressure washing, minor repairs, cleaning, and general upkeep
  • Maintain payroll, benefits, and workers’ compensation for all temporary employees
  • Comply with all OSHA safety requirements and provide all necessary safety equipment

Steps to Bid

  1. 1

    Review the full ITB and all attachments, including the bid form, specifications, and mandatory requirements.

  2. 2

    Attend the mandatory pre-bid conference and site inspection on November 20, 2026, at 8:00 AM at the Thibodaux, Schriever, Houma, and Houma Aviation Road campuses. Failure to attend will result in bid rejection. was Nov 20, 2026, 8:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit written inquiries to the Purchasing Director via email ([email available with Pro]) no later than 12:00 PM Central Time on November 20, 2026. was Nov 20, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Complete and sign the bid response form using the official template provided in the ITB.

  5. 5

    Submit the sealed bid, including one original signed form, to the Purchasing Department at Bossier Parish Community College, Building J, 6220 East Texas Street, Bossier City, LA 71111, by 2:00 PM Central Time on December 1, 2026. by Dec 1, 2026, 2:00 PM

What you'll need

Contract duration

8,320 hours for four workers, 2,080 hours for an additional worker, and 100 hours for overtime

Submission

Mail, Hand delivery

NAICS

561490, 561499

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 5-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Fletcher Technical Community College (FTCC) invites bids for the provision of temporary maintenance workers to support operations across multiple campus locations. The contractor shall provide four general laborers with a vehicle for travel between sites, capable of performing a wide range of physical maintenance tasks including event setup/teardown, furniture moving, pressure washing, minor plumbing and electrical repairs, drywall patching, cleaning, and general facility upkeep. All workers must be available for flexible scheduling, including weekends and after-hours. A mandatory pre-bid conference and site inspection is required on November 20, 2026, at 8:00 AM at the Thibodaux, Schriever, Houma, and Houma Aviation Road campuses. Bids must be submitted sealed, signed, and delivered to the Purchasing Department at Bossier Parish Community College, Building J, 6220 East Texas Street, Bossier City, LA 71111, by 2:00 PM Central Time on December 1, 2026.

Key dates

Pre-bid meeting
Nov 20, 2026, 8:00 AM Central Time
Site visit
Nov 20, 2026, 8:00 AM Central Time
Bids due
Dec 1, 2026, 2:00 PM CT

Documents

  • 9089200.docx

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby