OpenSuppliesCloses Dec 21, 2026

Material Recycling Facility & Maintenance Garage Duct Cleaning

Summit County, ColoradoBreckenridge, Summit, Colorado#FM 2026-0015

Summit County, Colorado is seeking qualified HVAC duct cleaning contractors to service the Material Recycling Facility and Maintenance Garage at 639 Landfill Rd., Dillon, CO 80435. Work must be performed after hours, Sunday through Saturday, from 6 PM. Contractors must be active NADCA members and comply with NADCA, SMACNA, NFPA, UL, and ANSI/IICRC standards. Cleaning must include all HVAC components, using dry, mechanical methods with HEPA-filtered vacuum equipment. Service openings must be installed per code and sealed with fire-rated, insulated panels. Contractors must submit a work plan, provide before-and-after photos, and verify cleanliness. All debris must be disposed of legally. A 10% retainage may be held until final inspection. Proposals must include a daily schedule and be submitted via email by December 21, 2026, at 2:00 PM MST.

On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 21, 2026
Time stated in bid documents
Dec 21, 2026, 2:00 PM Mountain Time
Submission
email
Contract term
12 months + Two additional 12-month renewal terms
Documents analyzed
5 published · 1 analyzed

Scope of work

  • Use HEPA-filtered equipment with 99.97% efficiency at 0.3 microns
  • Submit work plan, safety plan, and product data with SDS

Steps to Bid

  1. 1

    Register with Summit County procurement portal (if required)

  2. 2

    Attend the mandatory pre-bid meeting on December 1, 2026, at 10:30 AM MST at Summit County Commons, 37 Peak One Drive, Frisco, CO 80443 by Dec 1, 2026, 10:30 AM

  3. 3

    Submit questions to Mark Fisher ([email available with Pro]) or Wayne Byrne ([email available with Pro]) by December 15, 2026 by Dec 15, 2026, 2:00 PM

  4. 4

    Prepare and submit proposal via email to [email available with Pro] and [email available with Pro] by Dec 21, 2026, 2:00 PM

  5. 5

    Ensure email subject line reads: '<Vendor’s Name> - Proposal for: MATERIAL RECYCLING FACILITY & MAINTENANCE GARAGE DUCT CLEANING' by Dec 21, 2026, 2:00 PM

  6. 6

    Include in email body: 'ATTN: Wayne Byrne, Director, Facilities Maintenance Department, Proposal for: MATERIAL RECYCLING FACILITY & MAINTENANCE GARAGE DUCT CLEANING' by Dec 21, 2026, 2:00 PM

  7. 7

    Ensure proposal includes: company name, contact name and phone, scope of work, qualifications, daily schedule, and cost breakdown by Dec 21, 2026, 2:00 PM

What you'll need

Contract duration

To be agreed upon post-award, beginning January 2027.

Submission

Email

NAICS

561720, 561730

How to submit

Submit via email to [email available with Pro] and [email available with Pro]. Use subject line: '<Vendor’s Name> - Proposal for: MATERIAL RECYCLING FACILITY & MAINTENANCE GARAGE DUCT CLEANING'. Include in body: 'ATTN: Wayne Byrne, Director, Facilities Maintenance Department, Proposal for: MATERIAL RECYCLING FACILITY & MAINTENANCE GARAGE DUCT CLEANING'.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Summit County Government is soliciting proposals from qualified contractors to clean HVAC duct systems and associated equipment at two locations: the Material Recycling Facility at 639 Landfill Rd., Dillon, CO 80435, and the Maintenance Garage at the same address. The selected contractor must be an active member of NADCA and comply with NADCA cleaning specifications (Section 230130-50), ANSI/IICRC S520, NFPA 90A and 90B, SMACNA HVAC Duct Construction Standards, UL 181 and 181A, and NAIMA guidelines. No wet cleaning, steam, or power washing is permitted. Contractors must submit a pre-cleaning work plan, including scope, methods, and safety measures. Post-cleaning, contractors must provide before-and-after photos, system plans, and documentation of cleanliness verification. All debris must be sealed and disposed of in compliance with federal, state, and local regulations. The proposal must include a daily schedule to be agreed upon post-award. The County will not accept proposals that do not include a complete, responsive submission.

Key dates

Questions due
Dec 15, 2026, 2:00 PM Mountain Time
Pre-bid meeting
Dec 1, 2026, 10:30 AM Mountain Time
Bids due
Dec 21, 2026
Expected award
Jan 5, 2027

Documents

  • MRF_Duct_Cleaning_RFP.pdf15 pages
  • M2.0_Maintenance_Garage_Mechanical_Floor_Plan.PDF
  • M2.1_MRF_Mechanical_Floor_Plan.PDF
  • M1.0.PDF
  • M1.1_MRF_Maintenace_Garage_Equipment_Schedule.PDF

See all documents · Download with Pro

More from this agency

Closing soon near Breckenridge