McDuffie Main 25 kV Switchgear Upgrade Rebid
Alabama State Port AuthorityMobile, Alabama#11712-02
The equipment must be factory-assembled, complete with protective relays (SEL-351S), dedicated feeder meters (SEL-735), 48 VDC battery system with 10-hour reserve, and integrated communications via managed Ethernet and fiber optics. Installation is not required. Liquidated damages of $1,200 per day apply for delivery delays. A 100% performance bond is required. The proposal must clearly state lineup configuration, F.A.T. status, and control power voltage. Bids will not be publicly opened.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026, 2:00 PM CT
- Bid bond
- 5%
- Performance bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Scope of work
- Replace existing 25 kV main switchgear lineup at McDuffie Coal Terminal
- Supply complete 25 kV metal-clad switchgear with two main vacuum circuit breakers
- Include one tie vacuum circuit breaker, eight fused feeder compartments, and one spare compartment
- Provide SEL-351S relays for main and tie breakers, SEL-735 meters for all feeders
- Integrate managed Ethernet switch and fiber optic system for communications and monitoring
Steps to Bid
- 1
Review the full bid documents, including the Medium Voltage Switchgear Specification (250525.01-EL-SPEC-001), the Protection, Automation, and Communications Programming Specification (250525-EL-SPEC-002), and the attached drawings and data sheets.
- 2
Submit any technical or clarifying questions to Taylor Williams at [email available with Pro] by Wednesday, November 25, 2026, at 4:00 PM CST. by Nov 25, 2026, 4:00 PM
- 3
Ensure the bid is submitted in a sealed envelope with the bidder’s name, project name, and number clearly marked on the outside.
What you'll need
Submission
Mail, Hand delivery
NAICS
335918, 335919
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves the supply of a complete, factory-assembled 25 kV metal-clad switchgear lineup in a split, rear-accessible configuration on a common platform. The switchgear shall be designed for outdoor, coastal industrial use with NEMA 3R enclosure, corrosion-resistant materials, and compliance with ANSI, IEEE, NFPA 70, and NEMA standards. The project is procurement-only; the bidder will not perform installation. Bidders must clearly state whether their switchgear is a single continuous lineup or dual lineups, and whether they are performing factory acceptance testing. The project is not open to public bid opening. The right is reserved to reject any or all bids and to solicit best and final offers.
Key dates
- Questions due
- Nov 25, 2026, 4:00 PM Central Time
- Bids due
- Dec 3, 2026, 2:00 PM CT
Documents
- 11712-02-McDuffie-Main-Switchgear-ReBid-Documents.pdf48 pages
More from this agency
- Painting & Blasting Services – McDuffie Coal Terminal — closes Nov 23, 2026
- Engineering, Architecture, Planning and Program Management On-Call Services — closes Dec 3, 2026
Similar open bids
- Moon to Mars Architectural Studies — NextSTEP-3 Appendix B — NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
- Missile Defense Agency - NOBLE Announcement: Machine Aided Software Modernization (MASM) — MISSILE DEFENSE AGENCY (MDA)
- Empower Schools of Alabama: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — Empower Schools Of Alabama
- Xerox Copier Maintenance and Repair Services — State of Alabama - Tax Policy And Research
- Harvest Christian School: E-Rate FY2027 Category 1 & Category 2 - Internet Access and Data Transmission Service;… — Harvest Christian School
Closing this week nearby
- Satellite Phones and FirstSatNet PTT Services — closes Nov 19, 2026
- REQ #270161 Lexmark Printer for Legal — closes Nov 19, 2026
- Waste Removal Services for Cleburne and St. Clair Counties – FY27 — closes Nov 19, 2026
- Workforce Buildings Renovations — closes Nov 19, 2026
- Soccer Field Lighting Installation and Electrical Work — closes Nov 19, 2026