Mercedes Benz 24K Aircraft Refueler Truck and Spares
Dept of the Army — W6QK ACC- DTAMichigan#W912CH-27-Q-A027
The U.S. The refueler must be a 2026 model year or later, built to NFPA 407 and 385 standards, with a 6,350-gallon (24,000-liter) tank capacity for JP8 fuel. The vehicle must have a 6x4 chassis with a rear locking or limited-slip differential, a diesel engine compliant with EURO III emissions, automatic transmission, and be capable of 80% off-road use. The tank must be constructed of stainless steel (304 or 316), include internal baffling, a 3% expansion space, and be capable of both top and bottom loading at a minimum rate of 300 gallons per minute. The system must include a PTO-driven self-priming pump with a minimum discharge rate of 200 gpm, a filter and separator rated for 200 gpm, and two automatic rewind hose reels with 50 ft of aviation hose each. The vehicle must be equipped with a main control panel and cab controls for fueling operations, a grounding cable and reel, a ladder for tank access, and two ABC-type fire extinguishers. All controls, gauges, and labeling must be in metric units and in Arabic or universal symbols. The contractor must provide a unique item identifier (IUID) for all items with a government unit acquisition cost of $5,000 or more, using a data matrix symbol compliant with ISO/IEC 16022. The contractor must also comply with ISPM 15 for wood packaging materials. Proposals must be submitted electronically via the PIEE Solicitation Module at [link available with Pro]. The contractor must be registered in SAM and have access to the PIEE system.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 28, 2026
- Time stated in bid documents
- Dec 28, 2026, 11:00 AM Eastern Time
- Submission
- electronic portal
- Documents analyzed
- 5
- Required submission items
- 5 items · full checklist with Pro
Steps to Bid
- 1
Register in the System for Award Management (SAM) at Official linkPro.
- 2
Register and obtain access to the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at Official linkPro.
- 3
Review the solicitation documents, including attachments 0001 (Specifications), 0002 (Spare Parts List), 0003 (CDRLs), and the CDRLs A001 (Start of Work Meeting) and B001 (Photographs).
- 4
Submit the proposal electronically via the PIEE Solicitation Module by 11:00 AM ET on December 28, 2026. by Dec 28, 2026, 11:00 AM
What you'll need
Submission
Electronic portal
NAICS
336390
How to submit
Proposals must be submitted electronically via the PIEE Solicitation Module at Official linkPro. The offeror must ensure the proposal is received by the Government by the solicitation closing date and time. The offeror is responsible for ensuring the submission is completed in a timely manner. The Government is not obligated to search for incorrectly submitted proposals. The offeror is strongly advised to print or save a screenshot of the submission confirmation to validate the submission was accepted. The offeror must ensure all required documents are included in the electronic submission. The offeror must ensure the proposal is complete and contains all required information. The offeror must ensure the proposal is submitted in accordance with the instructions in Section L of the solicitation. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a format that is compatible with the PIEE system. The offeror must ensure the proposal is submitted in a格式.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The contract includes the delivery of photographs of the refueler and a Start of Work Meeting (SOWM) to be held within 90 business days of award.
Key dates
- Bids due
- Dec 28, 2026
Documents
- Solicitation_-_W912CH27QA027.pdf53 pages
- Mercedes_24K_Refueler_Specifications.pdf3 pages
- A001_Start_of_Work_Meeting.pdf2 pages
- B001_Photographs.pdf2 pages
- Spare_Parts_List.pdf1 pages
More from this agency
- Broad Agency Announcement: Research in Power and Mobility, Autonomous Systems, Force Projection, Survivability,… · closes Dec 31, 2026
- Research Proposals Sought in Power and Mobility, Autonomous Systems, Force Projection, Survivability, Electronics and… · closes Dec 31, 2026
- Broad Agency Announcement: Research in Power and Mobility, Autonomous Systems, Force Projection, Survivability,… · closes Dec 31, 2026
- Electrical Parts Kit (NSN: 6115-01-563-7966) · closes Jan 1, 2027
- Research Proposals Sought in Power and Mobility, Autonomous Systems, Force Projection, Survivability, Electronics and… · closes Jan 2, 2027
Similar bids in Michigan
- Procurement of Mercedes Benz Dry Side Fire Truck, Spares, Tools, Manuals, and OCONUS Training · closes Dec 11, 2026
- Starter, Engine · closes Dec 23, 2026
- 3/4 Ton Maintenance Truck · closes Dec 17, 2026
- 10 Person Van · closes Dec 17, 2026
- Commercial Solutions Opening for Stryker Family of Vehicles Modernization · closes May 7, 2031
Closing soon in Michigan
- Solicitation for Diagnostic Scan Tools W912CH27QA005 · closes Nov 30, 2026
- Calhoun ISD Doris Klaussen HVAC Upgrades Project · closes Dec 1, 2026
- 0.51 mi of Hot Mix Asphalt Cold Milling and Resurfacing, Storm Sewer, Concrete Curb, Gutter, Sidewalk, Ramps, Signing,… · closes Dec 4, 2026
- Track Replacement Project for Madison District Public Schools · closes Dec 4, 2026
- High School Fire Alarm & Gym Reno · closes Dec 4, 2026