OpenConstructionCloses Dec 18, 2026

Mill and Overlay SH8 from Old Kipling (MP 7.11) to Wadsworth (MP 8.65)

Colorado DOT — Region 1Jefferson, Colorado#STA 008A-011 (27341)

Colorado DOT is soliciting bids for mill and overlay of SH8 from MP 7.11 to MP 8.65 in Jefferson County. Scope includes milling, asphalt overlay, and ADA curb ramp improvements. The solicitation is advertised for October 2026, with a letting date of December 17, 2026. The project is managed by Thomas Dinardo. The work site is on State Highway 8 in Jefferson County.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 18, 2026
Time stated in bid documents
Dec 17, 2026, 11:59 PM Mountain Time
Submission
mail, hand delivery
Contract term
3 years + Two additional one-year renewal terms
Documents analyzed
3

Scope of work

  • Install ADA-compliant curb ramps at intersections
  • Remove and replace deteriorated pavement sections
  • Reconstruct and repair existing drainage structures
  • Implement traffic control during construction

Steps to Bid

  1. 1

    Register with CDOT's eProcurement portal (Official linkPro) and obtain a vendor ID.

  2. 2

    Review the full bid package, including plans, specifications, and addenda, available at Official linkPro

  3. 3

    Submit questions to Brian Kelly at 719-659-9447 or [email available with Pro] by December 10, 2026. by Dec 10, 2026, 11:59 PM

  4. 4

    Attend the pre-bid meeting on November 19, 2026, at 10:00 AM at the CDOT Region 1 office, 1000 15th Street, Suite 200, Denver, CO 80202. was Nov 19, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Mail, Hand delivery

NAICS

237131, 237132

How to submit

Submit one original and one electronic copy on a USB drive, both sealed in a single envelope. The envelope must be marked 'BID FOR STA 008A-011 (27341) - MILL AND OVERLAY SH8 FROM OLD KIPLING TO WADSWORTH'.

In person/mail: Colorado Department of Transportation, Attn: Thomas Dinardo, 1000 15th Street, Suite 200, Denver, CO 80202

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Mill and overlay of State Highway 8 from milepost 7.11 (Old Kipling) to milepost 8.65 (Wadsworth), Jefferson County, Colorado. The project is part of the Colorado Department of Transportation's 2026 construction forecast. The project is managed by Thomas Dinardo, Region 1 Project Manager. The delivery method is Design-Bid-Build.

Key dates

Pre-bid meeting
Nov 19, 2026, 10:00 AM Mountain Time
Bids due
Dec 18, 2026

Documents

  • CY_2026_Anticipated_Project_Advertisements.pdf6 pages
  • GO_Sheet.pdf4 pages
  • CDOTPlanHolders.pdf16 pages

See all documents · Download with Pro

More from this agency

Similar bids in Colorado

Closing soon in Colorado