Millswood Middle School Waterproofing/Painting Project No. 0967-8267-450-90
Lodi Unified School District — Maintenance & OperationsLodi, San Joaquin, California#0967-8267-450-90
Mills Ave, Lodi, CA. Work includes surface preparation, repair, and application of Sherwin-Williams Loxon XP Elastomeric Waterproofing Masonry Coating (2 coats) on concrete, stucco, CMU, and masonry; Sherwin-Williams SuperPaint Exterior Acrylic Latex Low Lustre (2 coats) on wood, plywood, and metal; and Pro Industrial DTM Acrylic Gloss (2 coats) on steel doors and jambs. Work must be performed only during school breaks, nights, weekends, and holidays, with no overtime. All substrates must be clean, dry, and moisture-free. Pressure washing at 2500–3500 PSI is required. Cracks and voids must be repaired with approved sealants. Paint must not be applied in rain, fog, or when temperatures are below 50°F. All work must follow Sherwin-Williams manufacturer instructions. A 5-year warranty is provided on materials only.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 12, 2027
- Time stated in bid documents
- Jan 12, 2027, 1:00 PM Pacific Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Repair cracks and voids with Sikaflex or Rapid Set sealant
- Prime all patched areas before painting
Steps to Bid
- 1
Review the full project manual and specifications available at Official linkPro and Official linkPro.
- 2
Submit all questions to Fatu Saina, Commercial Representative, at 209-251-9032 or [email available with Pro] by 1:00 PM on December 15, 2026. by Dec 15, 2026, 1:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
238290, 336115
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Pressure wash at 2500–3500 PSI to remove contaminants. All hardware, labels, and identification plates must be protected and not painted over.
Key dates
- Questions due
- Dec 15, 2026, 1:00 PM Pacific Time
- Bids due
- Jan 12, 2027
Documents
- ProjectManual_15.pdf
- Millswoodpaintspec.pdf22 pages
More from this agency
- Delta Sierra Middle School and Heritage Elementary School Bridge Portable Classroom Project No. 2600-4402-942-26 · closes Dec 18, 2026
- Julia Morgan ES Waterproofing/Painting Project No. 0968-8268-190-91 · closes Jan 5, 2027
- Exterior Waterproofing and Painting at Ansel Adams Elementary School, Stockton, CA · closes Jan 5, 2027
- Exterior Waterproofing and Painting of Borchardt Elementary School, Lodi, CA · closes Jan 12, 2027
- Ellerth E. Larson Elementary School Waterproofing/Painting Project No. 8150-5830-205-88 · closes Jan 12, 2027
Closing soon near Lodi
- As-Needed Unlawful Detainer Legal Services · Stockton · closes Nov 30, 2026
- 2050 General Plan and Two Master Plans Request for Proposals · Lodi · closes Dec 1, 2026
- 2026-2028 On-Call Well and Pump Repair Contract · Lodi · closes Dec 2, 2026
- Peters Pipeline Control Vault Replacement · Stockton · closes Dec 3, 2026
- Third-Party Administrator for Liability and Medical Malpractice Claims · Stockton · closes Dec 4, 2026