OpenIFBCloses Dec 3, 2026, 3:00 PM CT

Mitchell Road Bridge Over Kendrick Creek Replacement

City of KingsportKingsport, Tennessee#188706

The scope includes demolition, foundation work, structural steel, concrete deck, paving, drainage, and safety upgrades. Bids must be submitted by 4:00 P.M. A pre-bid conference is mandatory on November 17, 2026, at 2:00 P.M. A 5% bid bond is required. The successful bidder must provide 100% Performance and Payment Bonds.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 3, 2026, 3:00 PM CT
Time stated in bid documents
Dec 3, 2026, 4:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
3 items · full checklist with Pro

Scope of work

  • Demolish existing bridge structure
  • Construct new foundation and substructure
  • Erect structural steel superstructure
  • Install drainage and safety features

Steps to Bid

What you'll need

Contract duration

Not stated in the document.

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project includes full bridge demolition, site preparation, foundation work, structural steel erection, concrete deck pour, paving, drainage, and safety improvements.

Key dates

Pre-bid meeting
Nov 17, 2026, 2:00 PM Eastern Time
Bids due
Dec 3, 2026, 3:00 PM CT

Documents

  • Mitchell-Road-Bridge-Over-Kendrick-Creek-Replacement.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby