Statewide Bridge Management Plans
Minnesota DOT — MnDOT Consultant Services (Professional/Technical Contracts)Minnesota#1064190
The Minnesota Department of Transportation (MnDOT) is seeking proposals to develop strategic asset management plans for seven major river crossings on its Trunk Highway System. These plans will guide preventive maintenance, preservation, and rehabilitation activities to extend service life and reduce deterioration. For historic and Preservation Commitment Bridges, plans must adhere to Secretary of the Interior (SOI) Standards. All proposals must be submitted electronically via email. The project duration is anticipated to be approximately 36 months.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:59 PM CT
- Submission
- Documents analyzed
- 3
Scope of work
- Ensure strategies meet Secretary of the Interior (SOI) Standards for historic bridges.
- Provide optimized actions, timing, performance considerations, and service life estimates.
Steps to Bid
- 1
Submit questions via email only to Terri Johnson, Contract Administrator, using the subject line: MnDOT Contract No. 1064190, Statewide Bridge Management Plans. was Nov 17, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
Questions must be received by MnDOT no later than 2:00 pm Central Time.
- 2
Submit proposals electronically via email to Terri Johnson, Contract Administrator, with the subject line: MnDOT Contract No. 1064190, Priority Preservation Bridge Program Management Plans Project. Copy Consultant Services Forms Inbox: [email available with Pro]
All proposals must be received by MnDOT no later than 2:00 pm Central Time.
What you'll need
Contract duration
approximately 36 months
Submission
How to submit
All proposals must be electronically submitted, via e-mail, to the attention of: Terri Johnson, Contract Administrator, [email available with Pro]. Copy Consultant Services Forms Inbox: [email available with Pro]. Use the following as the subject line of your email: MnDOT Contract No. 1064190, Priority Preservation Bridge Program Management Plans Project.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
These bridges are high-priority assets due to their age, complexity, historic significance, and the high cost associated with potential future replacement. Several of the bridges already have scheduled maintenance or rehabilitation work, and one is a designated Preservation Commitment Bridge recently rehabilitated to historic standards. The goal of this project is to guide preventive maintenance, preservation, and rehabilitation activities that extend service life, reduce the risk of deterioration, and support effective use of dedicated preservation funding. The management plans must provide optimized actions, timing, performance considerations, and remaining service life estimates tailored to each bridge’s condition and planned work. Responders are encouraged to propose additional tasks or activities if they will substantially improve the results of the project. A detailed description of the scope of work and deliverables for this project has been posted separately from this announcement as “Exhibit C.”
Key dates
- Questions due
- Nov 17, 2026, 2:00 PM Central Time
- Bids due
- Dec 18, 2026, 11:59 PM CT
Documents
- WWW_POSTED_RFP_QBS_1064190-39256990-v1.pdf19 pages
- WWW_POSTED_SCOPE_1064190-39256991-v1.pdf11 pages
- WWW_POSTED_SPECIAL_PROVISIONS_1064190-39256992-v1.PDF36 pages
More from this agency
- Construction Communications, Engagement & Business Outreach for Robert Street Reconstruction Project — closes Nov 19, 2026
- Alternative Cementitious and Re-Recycled Materials in Concrete Pavements Research — closes Nov 19, 2026
- General Engineering Consultant (GEC) for Preconstruction Services Master Contract — closes Nov 19, 2026
- Historic Roadside Properties and Waysides: Historic Architect Design and Contract Administration - Fiscal Year 2027… — closes Nov 24, 2026
- Greater Minnesota Transit Technology Partners Assistance — closes Nov 24, 2026
Similar open bids
- Repair bridges, ADA improvements, and drainage from 0.02 mi west of US 169 to 0.09 mi west of Aquila Ave in Hopkins, MN — Minnesota DOT
- Bridge Reconstruction on SP 039-614-010, Baudette, MN — Lake of the Woods County
- Bridge Replacement (SAP 012-597-002 and SAP 012-597-003) — Chippewa County
Closing this week nearby
- Lincoln Park Middle School Dehumidification and Generator Improvements — closes Nov 19, 2026
- 2027 Pond Maintenance Project — closes Nov 19, 2026
- 2027 Pond Maintenance — closes Nov 19, 2026
- Lift Station #53 Rehabilitation — closes Nov 19, 2026
- Overhead Garage Doors Replacement and Installation — closes Nov 19, 2026