TH 55 Transportation Corridor Planning Study
Minnesota DOT — MnDOT Consultant Services (Professional/Technical Contracts)Minnesota#1063051
The Minnesota Department of Transportation (MnDOT) is seeking proposals for a transportation corridor planning study for Trunk Highway (TH) 55, covering approximately 14 miles from Medina to Golden Valley. This study, funded by a federal Reconnecting Communities grant, aims to enhance safety, connectivity, and accessibility. The project involves understanding multimodal transportation needs, developing goals and objectives, evaluating alternatives, and creating an implementation plan. The corridor is a four-lane, divided roadway with suburban land uses. The contract term is anticipated from 02/01/2027 to 10/31/2028, with an option to extend for one year. A Disadvantaged Business Enterprise (DBE) conscious goal of 10% has been established.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Jan 6, 2027, 11:59 PM CT
- Submission
- Contract term
- from 02/01/2027 to 10/31/28 + option to extend up to an additional one years in increments determined by MnDOT
- Documents analyzed
- 4
Scope of work
- Develop a vision to enhance safety, connectivity, and accessibility for all users.
- Coordinate with local partners: Metro Transit, Hennepin County, Metropolitan Council, Three Rivers Park District, and cities of Golden Valley, Plymouth, and Med
- Understand existing and future multimodal transportation needs.
- Develop and evaluate alternative concept layouts and recommendations.
- Create an implementation plan addressing short-term needs, fiscal constraints, and long-term vision.
Steps to Bid
- 1
Read the solicitation documents and ask questions, if any. by Dec 8, 2026, 11:00 AM
Questions must be emailed to Jodi Thurner, Contract Administrator, at [email available with Pro]. Use the subject line: MnDOT Contract No. 1063051, TH 55 Transportation Corridor Planning Study.
- 2
Submit your Proposal.
Proposals must be electronically submitted via e-mail to Jodi Thurner, Contract Administrator, at [email available with Pro]. You must copy [email available with Pro] on the email. Use the subject line: MnDOT Contract No. 1063051, TH 55 Transportation Corridor Planning Study.
What you'll need
Contract duration
18 to 24 months
Submission
How to submit
Proposals must be electronically submitted via e-mail to Jodi Thurner, Contract Administrator, at [email available with Pro]. You must copy [email available with Pro] on the email. Use the subject line: MnDOT Contract No. 1063051, TH 55 Transportation Corridor Planning Study.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
MnDOT is carrying out a transportation corridor planning study for Trunk Highway (TH) 55 from Arrowhead Drive in the City of Medina to the eastern border of the City of Golden Valley (approximately 14 miles). This study is part of MnDOT’s federally awarded Reconnecting Communities grant and will develop a vision to enhance safety, connectivity, and accessibility for all users along and across the corridor. The corridor is expected to receive several investments over the next decade, including a planned resurfacing project identified in the Metro Capital Highway Improvement Plan (CHIP) from Fernbrook Lane to Wright/Hennepin County Line and the anticipated 757 route developed as part of Metro Transit’s recent TH 55 Transit study. The 14-mile corridor segment is configured as a 50-mph to 55-mph four-lane, divided roadway that is classified as a principal arterial. It is mostly suburban in nature and contains both grade-separated and at-grade intersections. Segments of the corridor have parallel frontage roads and trail networks. Adjacent land uses vary from suburban residential to parks, commercial malls, schools, and industrial parks. The full scope of work is detailed in Exhibit C Specifications, Duties, and Scope of Work, posted separately. Responders are encouraged to propose additional tasks or activities if they will substantially improve the results of this Project. These items must be separated from the required items on the cost proposal.
Key dates
- Questions due
- Dec 8, 2026, 11:00 AM Central Time
- Bids due
- Jan 6, 2027, 11:59 PM CT
Documents
- WWW_POSTED_RFP_PART_A_1063051-39267698-v1.pdf16 pages
- WWW_POSTED_RFP_PART_B_1063051-39267701-v1.pdf11 pages
- WWW_POSTED_SCOPE_1063051-39267703-v1.pdf25 pages
- WWW_POSTED_SPECIAL_PROVISIONS_1063051-39267704-v1.PDF36 pages
More from this agency
- Historic Roadside Properties and Waysides: Historic Architect Design and Contract Administration - Fiscal Year 2027… — closes Nov 24, 2026
- Greater Minnesota Transit Technology Partners Assistance — closes Nov 24, 2026
- Robert Street Construction Contract Administration and Inspection — closes Dec 1, 2026
- Spot Mobility Implementation Analysis — closes Dec 1, 2026
- Big Spunk Rest Area Parking Lot Replacement & Expansion — closes Dec 2, 2026
Similar open bids
- Displacement Dashboard Development — Metropolitan Council
- BEaR Fixed Route Transit Services — Metropolitan Council
- TCIS Removal – Installation and Removal of Static/Dynamic Transit Customer Information Signs — Metropolitan Council
- AWD Secure Transport Vans - ADA Compliant — Minnesota Department of Administration
Closing this week nearby
- Designation of Official Newspaper for 2027 — Redwood County, MN — closes Nov 20, 2026
- Construction of 3 New Single Family Homes at 3719, 3627, and 3456 Penn Avenue N, Brooklyn Park, MN — closes Nov 20, 2026
- Replacement Cabinetry, Sink, and Countertops for Special Care Wing — closes Nov 20, 2026
- Cannon River Fish Passage Improvements — closes Nov 20, 2026
- Clean River Partners - Cannon River Fish Passage Improvements — closes Nov 20, 2026