Modernization of Sparks High School (CMAR SELECTION)
Washoe County School DistrictReno, Nevada#27-22-C-10-AA
PROJECT DESCRIPTION & BUDGET:Project Name: Modernization of Sparks High School Building Area(s): New Construction 47,000 SF / Remodel 26,000 SF Estimated Construction Budget: $70MLiquidated Damages: $ 5,000 per phasePRE-CONSTRUCTIONS SERVICES:Washoe County School District (WCSD) is seeking a qualified Construction Manager at Risk (CMAR) to provide pre-construction services during the design phase of the Sparks High School Modernization Project. The awarded CMAR’s duties will include, but are not
On PublicBidSearch: the original bid posting and 14 bid documents for this bid.
Overview
- Due
- Dec 3, 2026
Project details
The awarded CMAR’s duties will include, but are not limited to, the review of the following packages: schematic design; design development, and construction document deliverables provided by Collaborative Design Studio. The CMAR shall provide constructability analysis, phasing and logistics options, construction schedule; and cost estimates for each drawing deliverable; provide value engineering; and other typical CMAR preconstruction services. The CMAR shall also provide constructability analysis of the existing building as the CMAR deems necessary for the project, such as third-party constructability review, ground penetrating radar scanning, existing electrical feeder investigation, camera sewer/storm, and laser scanning above ceilings. The awarded CMAR will also be required to manage subcontractor procurement in accordance with all applicable laws and policies in the development of one (1) or more Guaranteed Maximum Price (GMP) construction contract for consideration by WCSD. PROJECT SCOPE:Sparks High School is an existing two (2) story building, approximately 156,000 SF and was constructed in 1951. The modernization will include expansion space of approximately 34,000 SF attached to the existing school. Spaces include eight (8) classrooms, hub spaces, library, Family Resource Center, Community in Schools. All new construction shall be one (1) story only. There is approximately 26,000 SF of existing space planned for remodel, including but not limited to the small gym, culinary classroom, P.E. locker rooms, limited classrooms and limited office areas. In the existing building a new fire sprinkler system will be installed, fire alarm, and security cameras will be replaced and added to the newly constructed areas. The scope will also include 12,000 SF for a new grounds building, activity room with storage, athletic field house, press box, artificial turf football field, practice soccer field, baseball and softball fields and dug outs. The parking lot will be expanded and renovated; removal of two (2) portables and three (3) other additional accessory buildings. All site improvements will include associated and required power, lighting and landscaping for a complete project. This is intended to be a phased project (most likely 2-3 phases) in an occupied school. See EXHIBIT K conceptual design plans.SUBMISSION DEADLINE FOR PROPOSALS:Proposals and any signed/acknowledged Addenda are to be submitted in a sealed envelope or box. Proposals are DUE to WCSD’s Purchasing Department located at 14101 Old Virginia Road, Room 0, Reno, Nevada 89521 no later than: DECEMBER 3, 2026, AT 2:00 PM (LOCAL TIME)Proposals will be opened publicly via a TEAMS Meeting at 2:30 pm (local time).Join: [link available with Pro] Meeting ID: 281 188 294 602 634 Passcode: WP772XC3
Key dates
- Bids due
- Dec 3, 2026
Documents
- 27-22-C-10-AA_-_Solicitation_Document.pdf9 pages
- Exhibit_A_-_CMAR_Pay_Rate_Reference_Sheet.xlsx
- Exhibit_B_-_CMAR_Fee_Proposal_Form.xlsx
- Exhibit_C_-_SAMPLE_Owner-CMAR_Pre-Construction_Contract.pdf5 pages
- Exhibit_D_-_SAMPLE_Owner-CMAR_Construction_Contract.pdf5 pages
- Exhibit_E_-_CMAR_GCs_-_Division_1.pdf1 pages
- Exhibit_F_-_Preferrential_Bidder_Status_Affidavit.pdf2 pages
- Exhibit_I_-_STEAM_Focused_Educational_Engagement.pdf3 pages
3 more files · 3 agency-portal links
More from this agency
- Mini-Modernization at Libby Booth Elementary School — closes Nov 20, 2026
- Washoe County School District: E-Rate FY2027 Category 2 - Routers, Switches, Wireless Access Points, and Related… — closes Nov 27, 2026
- Modernization of Sparks High School — closes Dec 3, 2026
- Information Technology Networking Equipment — closes Dec 16, 2026
Similar open bids
- Z1DZ--Replace Dental Vacuum Piping — VETERANS AFFAIRS, DEPARTMENT OF
- FY27 FRO Fire Jackets — Department of Conservation and Natural Resources
- RFP for Permanent Public Art at Reno-Tahoe International Airport New Gen A&B Concourses – 2D Digital Restroom Artwork — Reno-Tahoe Airport Authority
- RFP-Construction Manager at Risk (CMAR) New City Hall Project- Proposal Due Dec. 30, 2026 2:00 P.M. — City of Elko
Closing this week nearby
- Customer Portal & AMI Technology — closes Nov 19, 2026
- Fabrication and Installation of Four Steel Trellis Shade Structures at Green Valley High School — closes Nov 19, 2026
- Build Shade Structure Over Various Fields at Green Valley High School — closes Nov 19, 2026
- Highway Improvement at Beowawe Rest Area on I-80 – Contract #810-26 — closes Nov 19, 2026
- Printing and Mailing Services for Silver & Blue Magazine — closes Nov 19, 2026