OpenConstructionCloses Dec 10, 2026, 1:30 PM CT

Montezuma Light & Power - Montezuma Photovoltaic & Battery Energy Storage System Facility

Montezuma Light & PowerMontezuma, Iowa#10439157

The project must be substantially completed by July 30, 2027. Bidders must submit a 10% bid security in the form of a cashier’s check, certified check, certified share draft, or bid bond. A fully completed Bidder Status Form is required to avoid rejection. The project is subject to Buy America requirements, and preference will be given to Iowa-produced materials and labor. The Board will meet on December 16, 2026 to evaluate bids.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 10, 2026, 1:30 PM CT
Time stated in bid documents
Dec 10, 2026, 1:30 PM Central Time
Bid bond
10%
Submission
mail, hand delivery
Documents analyzed
1

Scope of work

  • Substantial completion by July 30, 2027
  • 97% payment upon certification of units completed
  • 3% payment within 30 days of final completion and acceptance
  • Comply with Buy America Act requirements

Steps to Bid

  1. 1

    Register for free access to digital documents at Official linkPro using Quest project #10439157.

  2. 2

    Obtain a paper set of proposal forms and specifications from DGR Engineering, Rock Rapids, IA, if desired.

  3. 3

    Prepare bid security equal to 10% of the bid amount, in the form of a cashier’s check, certified check, certified share draft, or bid bond.

  4. 4

    Submit a fully completed Bidder Status Form with the bid. by Dec 10, 2026, 1:30 PM

What you'll need

Insurance

Required

The bid security shall be made payable to Montezuma Light & Power. The bid security must not contain any conditions either in the body of as an endorsement thereon.

Contract duration

Substantial completion by July 30, 2027

Submission

Mail, Hand delivery

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction must be substantially completed no later than July 30, 2027. The project is subject to the Build America, Buy America Act (BABA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), requiring that all iron, steel, manufactured products, and construction materials be produced in the United States unless an approved waiver is obtained. Preference will be given to products grown and coal produced in Iowa, and to Iowa domestic labor. The project is located in Montezuma, Iowa.

Key dates

Bids due
Dec 10, 2026, 1:30 PM CT