Replace Existing Uninterruptable Power Supply at University of Missouri, Columbia
University of Missouri — UM System Facilities Planning & DevelopmentColumbia, Missouri#CP260981
The University of Missouri, Columbia, plans to replace an existing Ametek uninterruptible power supply (UPS) with an Eaton or comparable model. The project is in the design phase and not yet open for bids. The estimated advertisement date is October 29, 2026, and the estimated bid opening date is November 12, 2026. The procurement will follow a Design-Bid-Build delivery method. The project is managed by Craig Stichter in UM System Facilities Planning & Development. The base bid and alternate estimates are not yet available.
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Dec 10, 2026, 1:30 PM CT
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
Cancel anytime · no card to browse
Project details
The project is currently in the design phase and not yet advertised. This solicitation has not yet been issued; it is forecasted and will be formally advertised in the future under project number CP260981. The work will be performed at the University of Missouri campus in Columbia, Missouri.
Key dates
- Bids due
- Dec 10, 2026, 1:30 PM CT
More from this agency
- Clydesdale Hall Roof Replacement — closes Dec 8, 2026
- Memorial Stadium - East Bleachers Improvements and Renovations — closes Dec 9, 2026
Similar open bids
- Conduit and Fittings — City of Columbia (Missouri)
- Purchase of Five (5) White Minivans — Kansas City Area Transportation Authority (KCATA)
- Purchase of 18-Inch Gas-Powered Positive Pressure Ventilation (PPV) Fans, Series 7 Model with Honda GX200 Engine — City of St. Louis
- Baggage Conveyor Parts Supply Contract — City of St. Louis
- Data Transport Services and Dark Fiber — University of Missouri System
Closing this week nearby
- Engineering Services: Highway Safety Manual Analysis of CATSO Intersections and Roadways — closes Nov 20, 2026
- EV4880 Tax Burden Study — closes Nov 21, 2026
- Addition & Remodel to Existing Building at Mountain Grove High School Campus – OMTC Building — closes Nov 20, 2026
- Beverage Procurement Program — closes Nov 20, 2026
- Amphitheater Venue Management — closes Nov 20, 2026