OpenConstructionCloses Dec 2, 2026

Natural Chimneys Park D Loop Electrical Upgrade

Augusta CountyVerona, Augusta, Virginia#114301-27-01

Augusta County seeks a qualified electrical contractor to upgrade the D Loop electrical system at Natural Chimneys Park. Scope includes replacing the 800-amp panelboard, installing four new direct-buried aluminum feeders to 26 RV pedestals (24 x 30/20 amp, 2 x 50/30/20 amp), and full installation of new pedestal units. Work includes excavation (24-inch minimum width, 36-inch minimum depth), bedding with clean sand (6 inches below and above utility lines), backfilling, compaction, seeding, and strawing. All work must comply with OSHA, NEC, and NFPA 70E standards. Contractor must provide and maintain a portable toilet, keep the site clean, and remove trash daily. Project completion date is April 1, 2027. Bid must include a separate line-item cost for excavation and site restoration. Pre-bid conference is mandatory. Bid bond of 5% of bid amount is required.

On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 2:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
120 calendar days from Notice to Proceed
Documents analyzed
7 published · 2 analyzed

Scope of work

  • Replace 800-amp service panelboard at D Loop
  • Backfill and compact with clean material

Steps to Bid

  1. 1

    Register with Augusta County's vendor portal (eVA) and obtain a vendor ID.

  2. 2

    Attend the mandatory pre-bid conference on November 18, 2026, at 10:00 AM at Natural Chimneys Park, 94 Natural Chimneys Lane, Mt. Solon, VA. was Nov 18, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit all questions to the Bid Officer via the Pre-Bid Question Form by November 11, 2026 (3 business days prior to the bid due date). was Nov 11, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Prepare and submit a sealed bid, including the signed Bid Form, bid guarantee, and all required forms, by December 2, 2026, at 2:00 PM. by Dec 2, 2026, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contractor responsible for site cleanup, daily trash removal, and provision of a portable toilet. County will perform water line upgrades in the same trench.

Key dates

Pre-bid meeting
Nov 18, 2026, 10:00 AM Eastern Time
Bids due
Dec 2, 2026

Documents

  • IFB_1143012701.pdf46 pages
  • Park_Map_Exhibit_A_NC_Park_D_Loop_Campsites.pdf1 pages
  • IFB_1143012701.pdf46 pages
  • Park_Map_Exhibit_A_NC_Park_D_Loop_Campsites.pdf1 pages
  • Sign_In_Sheet.pdf2 pages
  • Addendum_1.pdf3 pages
  • Addendum_2_with_Ma.pdf4 pages

See all documents · Download with Pro

Similar open bids

Closing this week nearby