OpenConstructionCloses Dec 11, 2026, 11:59 PM CT

Guardrail Installation and Foreslope Flattening on I-29, Cass County, North Dakota

North Dakota Department of Transportation — NDDOTCass, North Dakota#HEN-X-XB-8-029(200)0

The North Dakota Department of Transportation is soliciting bids for 7.818 miles of high-tension cable median barrier and foreslope flattening on I-29 in Cass County, ND. Work includes installation of 39,157 linear feet of guardrail, 22 anchor assemblies, 275 man-hours of flagging, and 2,436 traffic control signs. The project is federally funded and requires a 10% bid bond or 5% cashier's check. Bids must be submitted electronically via Bid Express by 09:30 AM on December 11, 2026. Bid documents are available on the NDDOT ePlans portal.

On PublicBidSearch: the original bid posting, 10 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 11, 2026, 11:59 PM CT
Bid bond
10%
Submission
electronic portal
Documents analyzed
10 published · 3 analyzed

Scope of work

  • Remove and replace 640 linear feet of fiber rolls
  • Install 2,436 traffic control signs and 78 delineator drums
  • Provide 275 man-hours of flagging services

Steps to Bid

  1. 1

    Download bid documents from the NDDOT ePlans portal at Official linkPro.

  2. 2

    Submit a completed bid proposal form electronically via Bid Express at Official linkPro by 09:30 AM on December 11, 2026.

  3. 3

    Ensure the bid guarantee (10% bid bond or 5% cashier's check) is submitted with the bid.

What you'll need

Contract duration

7.818 miles of work to be completed by October 2, 2027.

Submission

Electronic portal

NAICS

237131

How to submit

Submit electronically via Bid Express at Official linkPro. The bid must include a completed proposal form, bid bond or cashier's check, and all required attachments. The bid must be received by 09:30 AM on December 11, 2026, in the CT time zone.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction of 7.818 miles of high-tension cable median barrier, foreslope flattening, and incidental work on I-29 near CMC 0928 N to CMC 0918 in Cass County, North Dakota. Work includes removal and replacement of existing fiber rolls, installation of 39,157 linear feet of high-tension cable guardrail, 22 high-tension cable anchor assemblies, 275 man-hours of flagging, 2,436 traffic control signs, 78 delineator drums, 225 tubular markers, 2 sequencing arrow panels, and 13.1 acres of straw mulch.

Key dates

Questions due
Dec 4, 2026, 9:30 AM Central Time
Bids due
Dec 11, 2026, 11:59 PM CT

Documents

  • Job_22888_Request_for_Proposal.pdf
  • HEN-X-8-029_200_069_ED_Final_Plans_1of3.pdf
  • HEN-X-8-029_200_069_ED_Final_Plans_2of3_XSEC.pdf
  • HEN-X-8-029_200_069_ED_Final_Plans_3of3_Standard_Drawings.pdf
  • 2021-03-23-FinalGeotechnicalReport-PCN_22888-zz.pdf777 pages
  • 2025-09-23-Addendum_to_FinalGeotechnicalReport-PCN_22888-zz.pdf
  • HTCG_Geotechnical_Report_22888_23330_23331_23332_23333-zz.pdf777 pages
  • HTCG_Geotechnical_Addendum_22888_23330_23331_23332_23333-zz.pdf

2 more files

See all documents · Download with Pro

More from this agency

Closing soon near Cass County