Newport Northside Pump Station Modifications Project
City of Newport — KN001008 - EngineeringOregon#S-KN0010-00018327
The City of Newport is soliciting bids for the Northside Pump Station Modifications Project. This project involves the installation of new screening conveyors, demolition and replacement of existing HVAC and odor control systems, and associated mechanical, electrical, structural, and site improvements. The work will be performed under a single lump sum contract. Bidders must be licensed Public Works Contractors in Oregon. The general prevailing wage rate is a requirement. The project includes a new screenings conveyor, a new foul air collection and treatment system with a dumpster cover, and HVAC system improvements. The contractor will be required to subcontract programming and integration services to The Automation Group. The project is funded in part by the Oregon State Lottery and administered by the Oregon Business Development Department. The bid number is S-KN0010-00018327.
On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 1, 2026
- Time stated in bid documents
- Dec 1, 2026, 2:00 PM Pacific Time
- Submission
- electronic portal
- Documents analyzed
- 8 published · 1 analyzed
Steps to Bid
- 1
Submit bids by the due date and time. by Dec 1, 2026, 2:00 PM
Bids must be received by December 1, 2026, at 2:00 PM.
What you'll need
Submission
Electronic portal
How to submit
Bids must be submitted by the due date and time.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves furnishing tools, equipment, materials, supplies, and manufactured articles, and performing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work or other operations required for the fulfillment of the Contract. The Contractor shall provide an internet-based construction management software package for submitting and tracking project-related documents such as RFIs and Submittals. The major project elements include: 1. New screenings conveyor, inclusive of power controls and mechanical connections. This also includes a new dumpster cover for the existing dumpster, as well as the required balancing of the system during startup. Improvements to the existing building HVAC system, including new supply and exhaust fans, modifications to ductwork and associated electrical work. Contractor shall subcontract Owner’s System Integrator (The Automation Group, [link available with Pro]) for all programming and integration services for the project. All other ancillary work as shown on the drawings and called out from the specifications. The Contractor shall commence work on or before a date to be specified in a written "Notice to Proceed" and complete all phases of the work as specified in the contract documents. The time is computed on a calendar basis. The Contractor acknowledges that construction during the winter at the project site will require cold weather construction methods. Any Contractor, Subcontractor, or Specialty Contractor is required to have a current license as a Public Works Contractor in the State where the work is to be completed in order to submit a bid or proposal on this contract. The general prevailing rate of wages, as determined by the Secretary of Labor, is a requirement of this project.
Key dates
- Pre-bid meeting
- Nov 12, 2026, 2:00 PM Pacific Time
- Site visit
- Nov 12, 2026, 2:00 PM Pacific Time
- Bids due
- Dec 1, 2026
Documents
- 225101_City_of_Newport_Northside_Pump_Station_Modifications_Plans_2026.10.22.pdf
- 225101_City_of_Newport_Northside_Pump_Station_Modifications_Specifications_V.pdf
- 225101_City_of_Newport_Northside_Pump_Station_Modifications_Specifications_V.pdf424 pages
- ADDENDUM_No._1_-_Newport_Northside_Pump_Station_Modifications.pdf
- ADDENDUM_No._2_-_Newport_Northside_Pump_Station_Modifications.pdf29 pages
- ADDENDUM_No._3_-_Newport_Northside_Pump_Station_Modifications.pdf3 pages
- ADDENDUM_No._4_-_Newport_Northside_Pump_Station_Modifications.pdf6 pages
- bidDetail.sda
Similar open bids
- Eastern Oregon Correctional Institution Attic HVAC and Controls Upgrade — Department of Corrections
- HVAC Unit Replacement at MacLaren Youth Correctional Facility — Oregon Youth Authority
- Tri-City WRRF Boiler Gas Feed — Clackamas County
- Precommercial Mechanical Mastication Thinning and Slash Treatment – 87.5 Acres, Umatilla Indian Reservation — Confederated Tribes of the Umatilla Indian Reservation
Closing this week nearby
- Transportation Land Use Planning Price Agreement — closes Nov 20, 2026
- Vegetables Frozen, Assorted — closes Nov 20, 2026
- On-Call Flagging and Traffic Control Services for Water Distribution Projects — closes Nov 20, 2026
- STEM Plan Implementation Support Contractor — closes Nov 20, 2026
- Washington County Young Adult Recovery Center — closes Nov 20, 2026