ClosedRFP

Non-Potable Pump Station Rehabilitation

City of EvansEvans, Colorado#FY26-015

The City of Evans, Colorado, is seeking qualified engineering firms to rehabilitate an existing non-potable pump station that draws raw irrigation water from a nearby storage pond. The scope includes full engineering design for mechanical, electrical, structural, and civil systems, including pump selection with VFDs, automated filtration, SCADA controls, structural repairs, site drainage, and physical security. Proposals must be submitted via BidNet in PDF format by 11:59 PM Mountain Time on December 8, 2026. A mandatory pre-bid meeting is scheduled for November 17, 2026, at 11:30 AM MT via Microsoft Teams. Questions must be submitted by November 24, 2026, at 11:59 PM MT. The firm must hold a valid City of Evans Business & Sales Tax License. The project must be completed by July 31, 2027. The City will not require a bid or performance bond. The contract is not set aside for any business type.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 25, 2026
Submission
electronic portal
Contract term
Five (5) consecutive years + Subject to annual appropriation and City designated authorization limits
Documents analyzed
1

Scope of work

  • Design energy-efficient vertical turbine pumps with VFDs and redundancy
  • Implement automated self-cleaning filtration system (2-stage) to protect distribution system
  • Upgrade electrical service panel, MCCs, and backup generator hookups
  • Develop SCADA and PLC control system for remote monitoring of pond levels, flow rates, and filter backwash cycles
  • Design site grading, drainage, and erosion control plans to prevent stormwater runoff into pond

Steps to Bid

  1. 1

    Register with BidNet and obtain access to the RFP portal.

  2. 2

    Attend the mandatory pre-bid meeting on November 17, 2026, at 11:30 AM MT via Microsoft Teams. was Nov 17, 2026, 11:30 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit all questions to Andy Vowell via email by November 24, 2026, at 11:59 PM MT. was Nov 24, 2026, 11:59 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Electronic portal

NAICS

541330

How to submit

Submit in PDF format via BidNet. Include firm name in file name. Limit to 25 pages or less, not including cover letter, resumes, or required forms. Submit all required forms and documents in the order listed.

In person/mail: 1100 37th Street, Evans, CO 80620-2036

Get alerts for bids like this

New engineering bids in Colorado

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Scope includes site surveying, condition assessment of the intake structure, wet well, pump house, and associated components; water quality testing for TSS, algae, and debris; hydraulic modeling; mechanical design of energy-efficient vertical turbine pumps with VFDs, automated self-cleaning filtration systems (2-stage), corrosion-resistant piping, isolation valves, intake screen systems, pond aeration, and HVAC for freeze and heat protection. Electrical and controls design includes a new electrical service panel, MCCs, backup generator hookups, SCADA and PLC control loops for remote monitoring of pond levels, discharge pressure, flow rates, and filter backwash cycles, integration with Watervision software, and a water metering system compatible with the city’s Sensus system. Cybersecurity recommendations for SCADA systems are required. Structural and civil design includes repairs or expansions to the concrete wet well, intake trash racks, and pump enclosure building with provisions for vertical pump removal and vac truck access. Physical security measures such as quality locks, security lighting, and cameras must be designed. Deliverables include 30%, 60%, 90%, and 100% design submittals, construction support, and final as-built drawings and O&M manuals. The City will provide pay application review and change order decisions. Reference checks may be used as a tiebreaker.

Documents

  • fy26-015-non-potable-pump-station-rehabilitation.pdf25 pages

See all documents · Download with Pro

Similar bids near Evans

Closing soon near Evans