OpenIFBCloses Nov 24, 2026

North Carolina Department of Military & Veterans Affairs

State of Nc - Construction OfficeNorth Carolina#SCO-23-26462-01A

The scope includes replacing geothermal heat pumps with new air-cooled DX units and a dedicated outside air unit (DOAS) for the kitchen. Work includes electrical, controls, ductwork, piping, and rough-in of geothermal piping (to be capped temporarily). The project is a single prime contract with lump-sum bids required. A mandatory pre-bid meeting and site walkthrough will be held on November 3, 2026, at 12:00 PM at the project site. A 5% bid deposit or bid bond is required. A 100% performance and payment bond is required. Bids must be submitted by 3:00 PM on November 24, 2026, to the N.C. Salisbury Street, Raleigh, NC 27603-1361.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Nov 24, 2026
Time stated in bid documents
Nov 24, 2026, 3:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1

Steps to Bid

What you'll need

Submission

Mail, Hand delivery

NAICS

238290, 238299

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project consists of replacing the existing geothermal heat pump units serving the Main Kitchen, Laundry Room, and all occupant rooms with new air-cooled DX units and a dedicated outside air unit (DOAS) for the existing kitchen. The work includes, but is not limited to, electrical power for new equipment, associated controls, ductwork, and piping. The scope of work includes all rough-in of the geothermal piping within the building that will be temporarily capped during Phase 1 and will be connected to the new geothermal heat pumps in Phase 2*. All work will be in the Base Bid unless otherwise noted. The owner reserves the right to retain the awarded contractor on Phase 1 to continue as the contractor for Phase 2. Attendance is mandatory. After the meeting, a site walkthrough will be conducted. The owner is considering the following preferred brand alternate: A. All new controls by Delta Controls. Justification for any approval will be made available to the public in writing no later than seven (7) days prior to the bid date. Payment will be made based on 95% of monthly estimates, with final payment upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for a period of 30 days. The owner reserves the right to reject any or all bids and to waive informalities.

Key dates

Pre-bid meeting
Nov 3, 2026, 12:00 PM Eastern Time
Bids due
Nov 24, 2026

Documents

  • SCO-23-26462-01A-NTB.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby