OpenIFBCloses Dec 31, 2026

North Coast Connector Land Bridge and Shoreway Conversion

City of Cleveland — Mayor's Office of Capital ProjectsCleveland, Ohio#OG-310813

The City of Cleveland is seeking a design-build team to construct the North Coast Connector, a land bridge over the Shoreway (State Route 2) and railroad tracks, connecting downtown Cleveland to Lake Erie. The project includes converting the Shoreway to a local boulevard, building the land bridge, improving the W. 3rd Street Bridge, and installing sidewalks, multi-use paths, retaining walls, and dedicated port access. The City plans to use a Progressive Design-Build (PDB) procurement model. An industry forum is scheduled for 28 October 2026 at 9:00 AM EST, and one-on-one meetings are available by request. Prime contractors must submit a meeting request by 9 October 2026 at 5:00 PM EST. All procurement activities will be conducted via the OpenGov portal.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 31, 2026
Time stated in bid documents
Dec 31, 2026, 11:59 PM Eastern Time
Submission
online portal

Steps to Bid

  1. 1

    Register for the industry forum event on 28 October 2026 at 9:00 AM EST via the Eventbrite link. was Oct 28, 2026, 9:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Request a one-on-one meeting with the City by completing and submitting the form by 9 October 2026 at 5:00 PM EST. was Oct 9, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Monitor the OpenGov portal (Official linkPro) for the release of formal procurement documents.

  4. 4

    Submit a formal proposal via the OpenGov portal when documents are released. by Dec 31, 2026, 11:59 PM

What you'll need

Submission

Online portal

NAICS

237130, 237199, 237999

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project will convert State Route 2 from a limited-access freeway to a safer, lower-speed local boulevard. Phase 1 includes the Shoreway conversion from West 9th Street to east of East 9th Street, construction of the land bridge, improvements to the W. 3rd Street Bridge, dedicated port access, demolition work, retaining walls, sidewalks, multi-use paths, and related infrastructure. The City will hold an industry forum on 28 October 2026 at 9:00 AM EST at the Huntington Convention Center of Cleveland, followed by one-on-one meetings (by request) for interested design-build teams with relevant experience. Prime contractors must request a meeting by 9 October 2026 at 5:00 PM EST. The OpenGov portal ([link available with Pro]) will be used for procurement activities and document submission.

Key dates

Pre-bid meeting
Oct 28, 2026, 9:00 AM Eastern Time
Bids due
Dec 31, 2026

More from this agency

Similar bids near Cleveland

Closing soon near Cleveland