The project, estimated at $250,000, must be completed during the summer break (7/1/2027–8/1/2027). The bid must be delivered in person or by mail to the Superintendent’s Office at 93 Pulpit Harbor Road, North Haven, ME, by 5:00 PM on December 7, 2026. Electronic submissions are not accepted.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 7, 2026
Time stated in bid documents
Dec 7, 2026, 5:00 PM Eastern Time
Submission
mail, hand delivery
Required submission items
6 items · full checklist with Pro

Scope of work

  • Total tear-off of existing compromised roof membrane
  • Deck inspection and restoration of damaged structural substrate
  • Insulation to current energy code
  • Installation of all flashings, coping, and drainage systems

Steps to Bid

  1. 1

    Review the full RFP, technical drawings, and specifications.

  2. 2

    Attend the mandatory pre-bid site walkthrough on Day 10 (December 17, 2026). by Dec 17, 2026

What you'll need

Submission

Mail, Hand delivery

NAICS

236220

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 8 watch-outs that disqualify bidders
  • The 6-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project value is structurally estimated at $250,000. Work is explicitly localized to a non-instructional break window of 7/1/2027 to 8/1/2027 to ensure zero operational crossover with student occupancy. The Contractor must pay wages and benefits in strict compliance with the Maine Department of Labor (MDOL) Wage Determination schedule. Use of tobacco, vaping, alcohol, or illicit substances anywhere on school grounds is prohibited and grounds for immediate removal. All staging areas, cranes, and disposal chutes must be securely fenced off. Clear exit paths and fire lanes must be maintained 24/7. Progress payments will be disbursed monthly based on actual work executed, with a 5% retainage holdback. Milestone 1 (Mobilization & Materials): $50,000 gross, $47,500 net. Milestone 2 (50% Completion): $75,000 gross, $71,250 net. Milestone 3 (Substantial Completion): $100,000 gross, $95,000 net. Milestone 4 (Final Closeout): $37,500 net, including release of accumulated retainage ($12,500). Weather delays may be granted only for abnormal, severe weather conditions with documented request and meteorological data within 48 hours. The bid must be delivered sealed to the Superintendent’s Office at North Haven Community School, 93 Pulpit Harbor Road, North Haven, Maine, no later than 12/7/2026 at 5:00 PM. Late bids or electronic submissions (fax/email) will not be accepted.

Key dates

Pre-bid meeting
Dec 17, 2026
Bids due
Dec 7, 2026