OpenIFBCloses Dec 3, 2026, 10:30 AM CT

Northwest Expansion Substation Construction

Huntsville UtilitiesHuntsville, Madison, Alabama#IFB 27-002

The work includes final grading, rebar, 4-inch #57 gravel surfacing, conduit systems, control cable, field terminations, and trench cover installation. Contractors must transport breakers and regulators from the utility’s warehouse and verify delivered materials. The contract duration is 150 calendar days. The bid bond is 5% of the total bid amount, not to exceed $10,000. Performance and payment bonds are each 100% of the contract amount. The pre-bid meeting is mandatory. Bidders must submit all documents exactly as specified; failure to comply may result in disqualification.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 3, 2026, 10:30 AM CT
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery, email
Contract term
150 calendar days
Documents analyzed
4 published · 3 analyzed

Scope of work

  • Construct 150 calendar days for the Northwest Expansion Substation
  • Install 4-inch layer of #57 gravel surfacing
  • Provide and install conduit systems and control cable
  • Perform field cable terminations and external conduit installation
  • Build metal cover to seal trench at control building

Steps to Bid

  1. 1

    Review the bid documents, including Addendum 1 and Addendum 2, and the attached drawings and geotechnical report.

  2. 2

    Submit all questions by email to John Lones by 5:00 PM CST on November 18, 2026. was Nov 18, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Ensure all required documents are included and properly labeled as specified in the bid instructions.

What you'll need

Contract duration

150 calendar days

Submission

Mail, Hand delivery, Email

NAICS

237130

How to submit

One (1) original copy, one (1) duplicate copy, and one (1) USB drive containing the bid documents. Clearly label the hard copies as 'Original' and 'Copy.'

In person/mail: P.O. Box 2048, Huntsville, AL 35804

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 8 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contractors are responsible for providing conduit systems, control cable, and associated miscellaneous construction materials. The site is currently graded but lacks final surfacing. Contractors must verify all delivered materials, report shortages or discrepancies immediately, and review the provided bill of materials. A work-order number will be provided for material procurement through designated suppliers. The geotechnical report is included in the addendum package. Contractors may submit reimbursement requests for materials such as conduit, fittings, and control cable, with markup percentages clearly identified in the bid documents. Bidders must submit one original copy, one duplicate copy, and one USB drive containing the bid documents.

Key dates

Pre-bid meeting
Nov 13, 2026, 10:00 AM Central Time
Bids due
Dec 3, 2026, 10:30 AM CT

Documents

  • Bid_Letter.pdf1 pages
  • Addendum_2.pdf3 pages
  • Addendum_1.pdf3 pages
  • Addendum_3.pdf3 pages

See all documents · Download with Pro