East Webster Tower and Booster Pumping Station – Water Storage and Pumping Infrastructure
City of Xenia Rural Water DistrictPocahontas, Iowa
Xenia Rural Water District is soliciting bids for the design, construction, and commissioning of a new 1,000,000-gallon composite elevated water storage tank with an in-line booster station in the lower level. Scope includes excavation, foundation work, fabrication, erection, disinfection, piping, electrical and control systems, granular access drive, fencing, gates, and site grading. The project is estimated at $8,500,000. Bids are due December 8, 2026, at 2:00 PM at the district’s office in Bouton, IA. Payment will be 97% of completed work on monthly estimates. Plans and specifications are available electronically at no cost and in paper form from HR Green, Inc., beginning November 12, 2026.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 8, 2026, 2:00 PM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Provide associated piping, electrical, and controls
- Deliver all labor, materials, and equipment per plans and specs
Steps to Bid
- 1
Obtain plans and specifications from HR Green, Inc. or via electronic access starting November 12, 2026. was Nov 12, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit questions to Chelsea Sullivan at [email available with Pro] by November 26, 2026. by Nov 26, 2026
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199, 237990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Work to be performed in accordance with plans and specifications. Engineer’s estimate: $8,500,000. Completion date: December 15, 2028. Bids must be submitted to Xenia Rural Water District at 23998 141st Street, Bouton, IA 50039. Electronic plans and specifications available at no charge. Paper copies and one unbound bid form available from HR Green, Inc., 5525 Merle Hay Road, Suite 200, Johnston, IA 50131. Contact Chelsea Sullivan at (515) 489-0084 or [email available with Pro] to order.
Key dates
- Questions due
- Nov 26, 2026
- Bids due
- Dec 8, 2026, 2:00 PM CT
Documents
- 0002-20261117-7cc70a1d3ee81801f99cd05c0e64634a.pdf2 pages
More from this agency
- East Guthrie Elevated Water Storage Tank – Construction and Site Work — closes Dec 8, 2026
- Xenia Highway 44 Pumping Station – New Booster Pumping Station Construction — closes Dec 8, 2026
Similar open bids
- 26-14 Sto822305D (Story) — Agriculture and Land Stewardship
- 26-15 Winn971022B (Winneshiek) — State of Iowa (University Procurement)
Closing this week nearby
- Drain/pipe cleaning svc/pit pumping & camera/televising svc 2027 — closes Nov 19, 2026
- Financial Advisory Services — closes Nov 19, 2026
- 2027 Airside Pavement & Markings Maintenance — closes Nov 19, 2026
- 2026-2027 Snow and Ice Removal From Public Sidewalks — closes Nov 19, 2026
- Electric Distribution Utility Maintenance Truck Chassis Upfits — closes Nov 19, 2026